bld20120219_Cooper.pdf
City of Edmonds
TH
121 5AVENUE NORTH •EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
EngineeringDivision
Plan Review Corrections
Plan Check :Date:
#BLD20120219May 21, 2012
th
Project Name/Address:
David Anderson Cooper –808 9Ave S
Contact Person/Address/Fax:
davcoopdba@hotmail.com
Reviewer:Jennifer LambertDivision:Engineering
During review of the subject submittal,it was found that the following information, corrections, or
clarifications wouldneed to be addressed. Our handouts can be found online at the City of
Edmonds web site www.ci.edmonds.wa.usunder City Government/Development
Services/Engineering Division.
General:
1.Please provide a copy of the Drainage Easement, Ingress/Egress and Utility easement and show on the
Plot Plan as shown on the short plat recording documents.
a.There is an easement shown on the plans with an AF NO 200612075216; however, I do not see
that easement number on the recoreding docs, but instead easement AFN 200612050694 is
shown. If the easement number shown exists please providing a copy of the easement;
otherwise, please revise accordingly.
b.Please reference the 10’ side sewer easement (AF NO 8312220095) that the proposed sewer is
connected to.
c.Please show and reference the 20’ City of Edmonds utility easement (AF NO 1166877) as shown
on the recording docs.
d.From the submitted plans it appears that you will be using the access and utility easement to
access the subject property. Please provide a copy of the easement so the it can be verified that
the subject property is approved toutilize the easement for access.
2.Please show the driveway approach on the plans.
3.Please note on the plans what the deck is constructed of and what is located beneath (i.e. wood –slotted
deck with landscape below).
DATE MAILED/FAXED5/21/2012PAGE ____ OF ___
12
Erosion Control:
1.Note on site planthat catch basin erosion and sedimentary control socks will be installed in the catch
basin in the right of way downstream of the property per Standard Detail E1.3.
2.Please clarify plans to show existing paved portions of the driveway. Will a rock construction entrance
beinstalled or will constructionvehicles remain within the paved portions?If a rock construction
entrance will be installed please add detail to plans or note on the plans that the construction entrance
will meet City of Edmondsstandard detail E1.2.
3.Please note on plans that exposed soils will be covered if not worked for more than two days.
4.Please add a note to the plans that all disturbed soils will be compost amended.
Utilities:
1.Clearly label existing utilitesand stubsboth onsite and within all easements(installed with the
subdivision–storm, sewer, water, power, phone, cable, and gas).
2.Please addand clearly labelall proposed utilities (sewer, water, power, phone, cable, and gas).
a.Please note that all new utilities must go underground.
3.Show side sewer clean out at the connection to the stub on the westproperty lineand 2’ fromthe house.
Grading:
1.Show bottom of footing elevationsat each step in the foundation, if any, onplansfor new home in order
to verify grading calculations.
2.Indicate if topos are existing (post short plat). If not please provide existing topos.
Drainage:
1.The City is unable to complete the review of the storm system at this time. Please review the
th
engineering report for 804-9Ave S(approved with short plat)that discusses the storm system installed
and address the requirements stated in the last paragraph on page A-1. You may review the document on
file at the City. If a storm system is proposed that differs from this report, you will need to provide a
report from a licensed engineer showing how your proposed system will adequately meet the city
requirementsand design approved for short plat.
2.Please note that if the proposed detention system does remain in the location proposed you will need to
show an access to the catch basin located under the deck.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator.Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE MAILED/FAXED5/21/2012PAGE ____ OF ___
22