City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check :Date:
# BLD20120219 May 21, 2012
th
Project Name/Address:
David Anderson Cooper – 808 9 Ave S
Contact Person/Address/Fax:
davcoopdba@hotmail.com
Reviewer: Jennifer LambertDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections,
or clarifications would need to be addressed. Our handouts can be found online at the City of
Edmonds web site www.ci.edmonds.wa.us under City Government/Development
Services/Engineering Division.
st
1 Review – 5/21/12
nd
2 Review – 6/21/12
General:
1.6/21/12 – Comment not addressed.
5/21/12 Comment: Please provide a copy of the Drainage Easement, Ingress/Egress and Utility
easement and show on the Plot Plan as shown on the short plat recording documents.
a.There is an easement shown on the plans with an AF NO 200612075216; however, I do not see
that easement number on the recording docs, but instead easement AFN 200612050694 is
shown. If the easement number shown exists please providing a copy of the easement;
otherwise, please revise accordingly.
b.Please reference the 10’ side sewer easement (AF NO 8312220095) that the proposed sewer is
connected to.
c.Please show and reference the 20’ City of Edmonds utility easement (AF NO 1166877) as shown
on the recording docs.
d.OK
2.OK
3.OK – If the deck is spaced.
DATE MAILED/FAXED 6/21/2012 PAGE ____ OF ___
13
Erosion Control:
1.OK
2.6/21/12 – A note was added to the plans; however, it is unclear where the construction entrance
will be located. Will the trucks remain on the paved driveway or will there be a construction
entrance placed on the property?
5/21/12 Comment: Please clarify plans to show existing paved portions of the driveway. Will a rock
construction entrance be installed or will construction vehicles remain within the paved portions? If a
rock construction entrance will be installed please add detail to plans or note on the plans that the
construction entrance will meet City of Edmonds standard detail E1.2.
3.OK
4.OK
Utilities:
1.OK
2.OK
3.6/21/12 – Comment was addressed; however, the path of the sewer has changed from the original
o
plans. Please show a cleanout at the 90bend.
5/21/12 Comment: Show side sewer clean out at the connection to the stub on the west property line and
2’ from the house.
Additional questions
4.Please provide the invert elevations for the side sewer at the cleanout at the house to verify that
2% slope and 2’ cover can be achieved.
5.Please note the size and material of the water service line.
6.Please add a note that a tracer wire will be placed on the water service line.
Grading:
1.OK
2.OK
Drainage:
1.OK
2.OK
DATE MAILED/FAXED 6/21/2012 PAGE ____ OF ___
23
Additional Questions
3.Please show all invert elevations for all pipes going into the catch basins (detention system and
existing).
4.It appears as though there may be an error on the invert elevations for the north catch basin of
the detention system. Please revise accordingly.
5.The detention system must have 1’ of cover when under landscape areas and 2’ of cover when
under drivable services. Please revise plans accordingly.
6.Please note the detention pipe material and the orifice size on the plans.
7.Please provide invert elevations for the tightline so that 1’ of cover and slope can be verified.
8.There is a note for a drywell; however, it is unclear what the drywell is for. Please clarify and
revise plans accordingly.
9.Please show how the runoff from the driveway will be collected to the existing stormwater vault
(i.e. directional arrows, catch basins, etc.).
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE MAILED/FAXED 6/21/2012 PAGE ____ OF ___