bld20120225 _Echelbarger-2.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20120225 May 1, 2012 nd Project Name/Address: Echelbarger New Single Family Residence 8719 192 St SW Contact Person/Address/Fax: Tod todd@echelbarger.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov : Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. General Plan: 1. 5/17/12 Done. Please provide 3 drawings for review as noted under requirements for submittal in the Single Family Handout #B73: plot plan (site plan), grading/tesc plan and a stormwater/utility plan. Please review the requirements for each plan in the handout under sections 4, 5, and 6. The following comments are separated roughly by the corresponding plans noted above. Site Plan: 5/17/12 Done. Storm/Utility 1. 5/17/12 Done. 2. 5/17/12 Done. 3. 5/17/12 Done. 4. 5/17/12 Done. 5. 5/17/12 Not Done. I’m sorry I should have specifically called out the private driveway. The proposed slope is 9.8 % and 7.8% toward the garage. How will the runoff be collected and connected to the storm system? How will driveway runoff be collected and directed to the storm system? Show on plans. 6. Call out size of water meter and whether “existing” or “proposed”. A new meter may be necessary if fire sprinkling is required by the Fire Marshall. 7. Call out size, material and length of water service line. For fire sprinkling requirements water line on property must be 1 1/2”. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 12 8. 5/17/12 I couldn’t find it anyway. Maybe just add a note. Please call out separation between sewer and water. 10’ is required. 9. 5/17/12 Done. 10. 5/17/12 Done.. 11. 5/17/12 The side sewer slope is under 2%, around 1.1%. Please revise to show that the 2% slope can be attained. Call out length of pipe to verify minimum slope of 2% is achieved. Call out size and material of pipe. Erosion/Grading 12. 5/17/12 Done. 13. 5/17/12 Done. 14. 5/17/12 Done. 15. 5/17/12 Done. 16. 5/17/12 Done.. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 22