Loading...
bld20120232_Karnofski-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20120232 April 17, 2012 Project Name/Address: Karnofski/Autry 721 Walnut St Addition Contact Person/Address/Fax: Phil King pkdphil@comcast.net 425-218-3881 Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: Please Note: All Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. 1. The impervious surface calculations note 200 sf proposed new impervious. The plans do not show where this new impervious is located. If the additions are being constructed within the roofline of the existing structure then the project incurs no additional impervious surface. Only if you are removing a portion of the building and replacing it (ground up) with a new area of structure in it’s place would the areas noted on the plans be considered new impervious surface. Please clarify on plans and revise calculations if necessary. 2. Please show the utilities, water and sewer lines, from the property line to the house. 3. If you are not removing any structures, please add note to plans “Erosion sediment control measures to be installed as needed.” If you are removing structures, then please submit a separate plan that shows all grading, existing and proposed topos and the location and type of erosion control measures. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 4/18/2012 PAGE _1__ OF _1_