bld20120301-WA Fed-Int_Exterior_remodel-E1.pdf
CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:May 9, 2012
TO:Bruce Lindeke
bruce@craftarchitects.com
FROM:Jeanie McConnell, Engineering Program Manager
RE:Application#:bld20120301
Project:Washington Federal –Interior/Exterior remodel
th
Project Address: 130 5Ave S
Duringreview of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Linda Thornquist.
City of Edmonds handouts,standard detailsand development codecan be referenced on the City
website.
1.Plans indicate replacement of several windows along the Dayton Street side of the building.
Please confirm how these windows will be installed and whether closure of the sidewalk will be
required to perform this work. If sidewalk closure is necessary thena separate right-of-way
construction permitwith traffic controlplan for closure will be required.
2.The dumpster /staging area is shown within the parking lot on private property on the west side
of the alley. Will debris be brought from thebuilding to the dumpster by hand and therefore
eliminating potential disruption to the alley/access?
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.usif you have
specific questions regarding these plan corrections.
bld20120301-WA Fed-Int_Exterior_remodel-E1.docx
Page 1of 1