Loading...
bld20120301-WA Fed-Int_Exterior_remodel-E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:May 9, 2012 TO:Bruce Lindeke bruce@craftarchitects.com FROM:Jeanie McConnell, Engineering Program Manager RE:Application#:bld20120301 Project:Washington Federal –Interior/Exterior remodel th Project Address: 130 5Ave S Duringreview of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Linda Thornquist. City of Edmonds handouts,standard detailsand development codecan be referenced on the City website. 1.Plans indicate replacement of several windows along the Dayton Street side of the building. Please confirm how these windows will be installed and whether closure of the sidewalk will be required to perform this work. If sidewalk closure is necessary thena separate right-of-way construction permitwith traffic controlplan for closure will be required. 2.The dumpster /staging area is shown within the parking lot on private property on the west side of the alley. Will debris be brought from thebuilding to the dumpster by hand and therefore eliminating potential disruption to the alley/access? Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. bld20120301-WA Fed-Int_Exterior_remodel-E1.docx Page 1of 1