Loading...
bld20120301-WA Fed-Int_Exterior_remodel-E2.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:June 15, 2012 TO:Bruce Lindeke bruce@craftarchitects.com FROM:Jeanie McConnell, Engineering Program Manager RE:Application#:bld20120301 Project:Washington Federal –Interior/Exterior remodel th Project Address: 130 5Ave S During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below toLinda Thornquist. City of Edmonds handouts,standard detailsand development codecan be referenced on the City website. Review 1 –May 9, 2012 Review 2 –June 15, 2012 June 15, 2012 –Plans have been revised to include the following note: “Pedestrian 1. protection (actually it says project) to be provided per IBC 3306 for all work performed adjacent to pedestrian walkways. Use of theCity right-of-way will require a separate right-of-way construction permit. Depending on how the work will be performed, full sidewalk closure may be required. Please confirm how the windows will be installed and whether closure of thesidewalk will be required to perform this work. May 9, 2012 comment -Plans indicate replacement of several windows along the Dayton Street side of the building. Please confirm how these windows will be installed and whether closure of the sidewalk will be required to perform this work. If sidewalk closure is necessary then a separate right-of-way construction permit with traffic control plan for closure will be required. June 15, 2012 –No response received. 2. May 9, 2012 comment -The dumpster /staging area is shown within the parking lot on private property on the west side of the alley. Will debris be brought from the building to the dumpster by hand and therefore eliminating potential disruption to the alley/access? Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. bld20120301-WA Fed-Int_Exterior_remodel-E2.docx Page 1of 1 Page 2of 2