Loading...
bld20120336_Acme_Homes.pdf City of Edmonds TH 121 5AVENUE NORTH •EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT EngineeringDivision Plan Review Corrections Plan Check :Date: #BLD20120366May 30, 2012 th Project Name/Address: Acme Homes –23419–84Ave W Contact Person/Address/Fax: acmedrywall@gmail.com Reviewer:Jennifer LambertDivision:Engineering During review of the subject submittal,it was found that the following information, corrections, or clarifications wouldneed to be addressed. Our handouts can be found online at the City of Edmonds web site www.ci.edmonds.wa.usunder City Government/Development Services/Engineering Division. 1.Please note on the Site Plan that catch basin erosion and sedimentary control socks will be installed in the catch basin in the right of way downstream of the property per Standard Detail E1.3. 2.Please show the location of the silt fence and note that the fence will be installed per Edmonds Standard Detail E1.1. 3.Please show all trees within the construction area and label to be removed or remain. a.If trees are to remain and near the construction area, please show a barrier fence around the tree to protect during construction. 4.Please show the limits of construction. 5.Please show the location of the side sewer from the sewer main to the house. 6.Please note on the Site Plan that the side sewer will be cut and capped at the property line prior to demo. 7.Please show the water service line from the meter to the house. 8.Please note on the Site Plan how the site will have access to water during demo and construction. DATE MAILED/FAXED5/30/2012PAGE ____ OF ___ 12 9.Please note that the water service line will be disconnected at the meter. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator.Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE MAILED/FAXED5/30/2012PAGE ____ OF ___ 22