BLD20120346.pdfO V E� OWN
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020
��c. 1890
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 5/15/2012 Permit #: BLD20120346'
BUILDING 1"ERMIT
Expiration Date: 11/15/2012 Project Address: 18416 OL MPIC VIEW DR,,
EDMONDSi
Parcel No: 00565600200301
HOWARD H BOBRY
BOBBY VALERIE J
18416 OLYMPIC VIEW DR
EDMONDS, WA 98020
(425)774-7419
PRIMA PLUMBING
GRETA FISCHER
903 NW 50TH ST
SEATTLE, WA 98107
(206)706-0300
REMOVE EXISTING TUB AND REPLACE WITH SHOWER.
INSTALL FREE STANDING TUB WITH FIXTURES/DRAIN.
2 WALL MOUNT LAV SINKS WITH NEW FIXTURES.
SUBJECT TO FIELD INSPECTION.
VALUATION: $0:00
PRIMA PLUMBING
903 NW 50TH ST
SEATTLE, AL 98107
(206)706-0300
LICENSE #: PRIMAP*004J4 EXPA/18/2013
Lj
'[�Isr
PERMIT TYPE: Residential
PERMIT GROUP: 47 - Plumbing/Water Service Line/Fountain (ONLINE)
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION:
RETAINING WALL ROCKERY: N
OCCUPANT GROUP:
OCCUPANT LOAD:
FENCE: N ( 0 X 0 FT.)
CODE:
OTHER: N ----- OTHER DESC:
ZONE:
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: I
LOT #:
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER 0
13RD FLOOR: 0 GARAGE- 0 DECK: 0 OTHER: 0
FRONTSETBACK SIDE SETBACK REAR SETBV��—Jl
REQUIRED: PROPOSED: RE UIRED: PROPOSED: I REQUIRED: PROPOSED:
HEIGHT ALLOWED:O PROPOSED:O RE UIRED: PROPOSED:
SETBACK NOTES:
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18:27.
THIS APPLICATION IS NOT A PERMIT UNTIL_SIGNED,B-Y TH&BUILDING OFFICIAL OR HIS/HER REPUTY_AND ALL FEES ARE PAID,
Date
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBC 1 10/ IRC 110.
�4 ONLINE = APPLICANT = ASSESSOR = OTHER
STATUS: ISSUED
BLD20120346
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• SoundMoise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must
comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any
ordinance provision.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY, ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
CALL 1,011 INSPECTIONS
BUILDING 425 771-0220 EXT. 1333 ENGINEERING 425 771-0220 EXT. 132677FIRE 425 775-7720
PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425 672-5755 1 RECYCLING 425) 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
• B-Plumb Rough In
• B-Plumbing Final
°- k Mo, Inspection Comments
BLD20120346 47 - Plumbing/Water Service Line/Fountain
W Applied: 05/11/2012 �ONejNE) 05/15/2012 Expires: 11/15/2012
Address: 18416 OLYMPIC VIEW DR, EDMONDS
INSPECTION DATE INSPECTOR ACTION
1126 - B-Plumb Rough In 05/24/2012 LAWLER CMP
Comment:
1152 - B-Plumbing Final
Comment:
08/03/2012 LAWLER CMP
8/3/2012 2:21:32 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 1
• SCOPE OF WORK:
Drains and vents for toilet position and no lays work needed.
Plumb a 2" ABS plastic pipe drain line to the new bathtub position on south wall with vent tie-in with the
lav sink in the bathroom on the opposite wall.
Convert the existing bathtub drain to a shower drain and tie-in to the vent pipe in the wall.
Water piping in copper materials to new fixture positions. Cap the toilet water pipe until the finish -set
phase. Elevate the lav sink hot and cold water piping to each of the wall mount type faucets. Pipe the
tub filler valve into the wall position with W piping from the garage ceiling points.
Rework the shower piping from the %:" size piping in the wall of the existing tub/shower valve with
piping for a conventional shower head and in -wall separate valve for a rain head in the center of the
shower.
Set the bathtub into position following manufacturers' installation guide. Install and connect the drain
and overflow assembly to the trap. Test the drain for leaks.
Finish -Set Phase--finish-set fixtures and faucets of toilet, two wall mount lav sinks, trim of shower valve,
head and rain head. Complete bathtub trim, all ready for use and final inspection.