Loading...
BLD20120446.pdfS • ' Y III IICI 08 OF ED,V �~ ° CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 / 'lc. 1 Sq0 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 8/22/2012 Permit #: BLD20120446 Expiration Date: 8/22/20N] Project Address: -18007 VISTA DEL MAR DR, EDMONDS Parcel No: 00914200001200 117:ZOE1R11YO]yy►911: \ 6i 11 [ MIt n' AAC Ill JANETTE RONQUILLO RONSCOTT CONSTRUCTION INC RONSCOTT CONSTRUCTION INC 8817 207TH PL SW 761 Daley Street 761 Daley Street EDMONDS, WA 98026-6678 Edmonds, WA 98020 Edmonds, WA 98020 (425)673-0163 (425)673-0163 LICENSE #: RONSCC1964MF EXP:9/16/2012 NEW SINGLE FAMILY RESIDENCE - INCLUDES MECHANICAL AND PLUMBING IW,-z',b VALUATION: $597,139.20 y�w�/�� PERMIT TYPE: Residential PERMIT GROUP: 64 - Single Family Residence New GRADING: Y CYDS: 1050 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: N OCCUPANT GROUP: R-3 OCCUPANT LOAD: FENCE: N 0 X 0 FT.) CODE: 09 OTHER: N ------ OTHER DESC: ZONE: RS-12 NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 1799 1ST FLOOR: 3381 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 1552 DECK: 366 OTHER: 0 FRONTSETBACK SIDE tEQUIRED:25 PROPOSED: 25 REQUIRED: 10 PROPOSED:10 RE UIRED: PROPOSED: IEIGHT ALLOWED:25 PROPOSED:24.83 I REQUIRED: 25 PROPOSED: 25 iETBACK NOTES: 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:2T I ON IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AL4D ALL FEES ARE PAID. Signs ure Print Name Date Released Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC110/ IRC110. = ONLINE = APPLICANT = ASSESSOR OTHER STATUS: ISSUED BLD20120446 CONDITIONS • 1) Not an Accessory Dwelling Unit (ADU). • 2) Chimney must comply with ECDC 21.40.030.D.4: "Chimneys, not to exceed nine square feet in horizontal section or more than three feet in height, for that portion above the height limit." • 3) Must follow geotechnical report recommendations. • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Installation, use and maintenance of equipment and components shall be per manufacturer's specifications, installation instructions, and applicable state codes. Provide manufacture's installation instructions on site for Building Inspector. • Approval of this foundation design is conditional subject to inspection of existing site soil conditions. • Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material. • Provisions must be made for the control and drainage of surface water around buildings. • Installer shall provide the manufacturer's installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Maximum Height 25 feet. The agent/contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspection to verify. These items must be consistent with the approved plan. If the proposed height of a building (as shown on the plans) is within 12 inches of the maximum height permitted for the zone an elevation survey is required. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Type B or L vent connectors required on fuel -burning appliances passing through unheated spaces. Per IMC 803.2 • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building. • Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted. • City approved plastic piping may be used in water service piping provided that where metal water service piping is used for electrical grounding purposes, replacement piping shall be of like materials (UPC 604.8). A state electrical permit and inspection is required if electrical grounding is altered, removed, improved, or added. Contact State Dept. of Labor & Industries Electrical Division at 425-290-1309. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Provide combustion air per IMC Chapter 7 for commercial and multi -family residential installations, and IRC Chapter 17 for one and two-family dwellings. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance.nor limit in any way the City's ability to enforce any ordinance provision. • Refer to City of Edmonds Water service line handout for approved pipe materials, inspections and other requirements. • 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771-0220, ext.1326. 0 New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible from the public way, at least 4 inches high with a % inch min. stroke width on a contrasting background. • Independent certified backflow tester to perform test on backflow assembly and submit report to city. • Call for locates of underground utilities prior to any excavation. • Maintain erosion & sedimentation control per city standards. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements. • Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 PUBLIC WORKS 425) 771-0235 PRE-TREATMENT 425) 672-5755 RECYCLING (425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E-Erosion Control/Mobilization • E-Storm Tightline • E-Storm Connect to Stub • E-Storm Detention System • E-Footing Drain Connection • E-Water Service Line • E-Engineering Final • B-Preconstruction meeting • B-Setbacks • B-Footings • B-Foundation Wall • B-Foundation Drainage • B-Isolated Footings/Piers • B-Slab Insulation • B-Plumb Ground Work • B-Plumb Rough In • B-Gas Test/Pipe • B-Mechanical Rough In • B-Exterior Wall Sheathing • B-Roof Sheathing • B-Height Verification • B-Framing • B-Interior Shear Walls • B-Insulation/Energy • B-Sheetrock Nail • B-Building Final • F-Fire Final • E-Sidewalk Post -Pour DAf U � OF E� O�w CITY OF EDMONDS {•r 'K.3i 121 5TH AVENUE NORTH - EDMONDS, WA 98020 44' a PHONE: (425) 771-0220 - FAX: (425) 771-0221 Inc. 189 Tuesday, June 12, 2012 This Application has been accepted by the City of Edmonds for review. More information and changes may be required during this process. The review target date is: Tuesday, July 10, 2012 Your City Contact is: MARIE HARRISON Application Number: BLD20120446 Project Address: 18007 VISTA DEL MAR DR, EDMONDS PROPERTY OWNER APPLICANT JANETTE RONQUILLO RONSCOTT CONSTRUCTION INC 8817 207TH PL SW 761 Daley Street EDMONDS, WA 98026-6678 Edmonds, WA 98020 (425)673-0163 Work Description: NEW SINGLE FAMILY RESIDENCE. Outstanding Items at Time of Submittal: RENEW CITY OF EDMONDS BUSINESS LICNESE. I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION THAT THE INFORMATION GIVEN IS CORRECT To view up to date information about your application please visit the City of Edmonds Development Services website at http://www.ci.edmonds.wa.us.