Loading...
bld20120454_Landsverk_ENG1.pdf City of Edmonds BLD20120454 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Permit Application :Date: # BLD20120454 July 18, 2012 th Project Name/Address: Landsverk – 8510 – 184 St SW Contact Person/Address, Fax or E-mail: trisha@lqh-inc.com , duane@lqh-inc.com Reviewer: JENNIFER LAMBERT Division: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: General: 1)Add grading calculations to the plan. 2)Please revise title of Site Plan to state “Site / Drainage / Utility / TESC Plan”. 3)Please show the driveway from the paved road to the property. 4)The General Notes section where not attached. Please attach to the plans. 5)The construction sequence was not attached. Please attach to the plans. : Erosion Control 1)Please show the appropriate temporary erosion control measures to be installed and note the appropriate City of Edmonds Standards details. Utilities: 1)Please attach a copy of the utility asbuilt from the subdivision or show the utilities from the city main lines to the subject property. 2)Please show that the phone, cable, power, and gas have a minimum of 3’ separation between the utilities and the storm line, side sewer, and water service line. 3)Please note what size pipe and the pipe material that will be used for the water service line. DATE E-MAILED 7/18/2012 PAGE() 1 City of Edmonds BLD20120454 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 4)Please show the side sewer from the stub (installed with the subdivision) to the house. a.Please provide invert elevations at the sewer stub and cleanout at the house to verify cover and slope. b.Please note what size pipe and the pipe material that will be used for the side sewer. Drainage: 1)Please show where the footing drains will be drain to. 2)Please show how the runoff from the driveway will be collected and discharged to the detention system. Sheet flow to CB # 7 is not permitted. 3)Please note what size pipe and the pipe material that will be used for the storm lines. Please resubmit 3 copies of the revised traffic control plans and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 ext 1321 or by e- mail at jennifer.lambert@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 7/18/2012 PAGE() 2