Loading...
bld20120455-Chase_Bank and bld20120925-Walgreens-E5 and email.pdf From:McConnell, Jeanie To:"Bill Ruecker (billr@baysingerpartners.com)"; ""Craig Harris" (craigh@aaieng.com)"; "Norm Scheg (norms@aaieng.com)" Cc:Harrison, Marie; Thornquist, Linda Subject:RE: Walgreens - Edmonds Date:Wednesday, May 01, 2013 5:07:33 PM Attachments:bld20120455-Chase_Bank and bld20120925-Walgreens-E5.pdf ROW_Permit_Application.pdf Hello, Please find attached a memo with a few remaining comments to be addressed. I have also attached a ROW permit application for your contractor to complete. Please submit a signed copy of this application so I can complete the ROW permit application. Once the cost estimate is updated I will be able to calculate engineering inspection fees as well as a bond amount for the project. I also need one more full set of plans, less the Olympic View Water Sewer District plans for which you already provided 4 sets. Thank you! Jeanie McConnell Engineering Program Manager ΓΑΔȁΖΖΐȁΏΑΑΏ ·ΐΒΒΗ www.edmondswa.gov From: McConnell, Jeanie Sent: Wednesday, May 01, 2013 8:42 AM To: Bill Ruecker (billr@baysingerpartners.com); 'Craig Harris' (craigh@aaieng.com); Norm Scheg (norms@aaieng.com) Subject: Walgreens - Edmonds Good morning, Thank you for your patience as I work my way through my projects. I wanted you to know that I have a precon meeting out in the field this morning for another project and after that I will be working to complete civil plan review approval for this project. I will follow up with you later today to let you know if there is anything else we need or what the status is. Regards, Jeanie McConnell Engineering Program Manager #¨³¸ ®¥ %£¬®­£² Ȟ 0´¡«¨¢ 7®±ª² $¤¯ ±³¬¤­³ th ΐΑΐ Δ !µ¤­´¤ .®±³§Ǿ %£¬®­£² 7! ΘΗΏΑΏ ΓΑΔȁΖΖΐȁΏΑΑΏ ·ΐΒΒΗ Ȟ www.edmondswa.gov CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:March 25, 2013 TO:Norm Scheg –norms@aaieng.com Craig Harris –craigh@aaieng.com FROM:Jeanie McConnell, Engineering Program Manager RE:Application#:bld20120455 Project:Chase Bank –New Bank Project Address: 9801 Edmonds Way Application #: bld20120925 Project: Walgreens Project Address: 9797 Edmonds Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. City of Edmonds handouts, standard details and development code can be referenced on the City website. st 1Review –August 13, 2012 nd 2Review –December 6, 2012 rd 3Review –February 12, 2013 th 4 Review –March 25, 2013 th 5Review –May 1, 2013: All but the following items have been addressed. Please submit revised plans as needed. GENERAL May 1, 2013 –Please revise the cost estimate as follows: 1. a.Add rock construction entrance b.Revise sawcut quantity to include sawcut of entire frontage. c.Revise sidewalk demo quantity to include demo of entire sidewalk along frontage d.Add asphalt patch within right-of-way e.Add Type 1 CB’s to be installed within City storm easement f.Revise number of on-site CB’s to reflect what’s shown on the plans. bld20120455-Chase_Bank and bld20120925-Walgreens-E5.docx Page 1of 3 g.Revise storm pipe within ROW to reflect PVC. h.Add ductile iron storm pipe and pipe anchors. i.Under Write-In Items, please shown drainage infrastructure in the appropriate column. j.Add traffic control k.Add pavement striping March 25, 2013 –The cost estimate is currently being reviewed and any comments will follow these plan corrections. February 12, 2013 –Response comments state the values have been updated, but I am not able to find a copy of the estimate within the submittal packet. Please submit for review. 12/6/2012 -Thank you for providing a cost estimate. The estimate will be reviewed inmore detail once the civils plans are closer to their final form. In an initial review of the document the following corrections/information was noted: l.Sidewalk thickness shall be 5 ½” thick (currently shown as 4” in estimate) m.Sawcut for work within CityROW shall be included in estimate 8/13/2012 comment -Please provide an itemized engineers cost estimate, including units and unit prices, for both on-site and off-site (right-of-way) improvements, including traffic control. The City recommends use of the King County Site Improvement Bond Quantity Worksheet. A bond is required to be placed for all right-of-way improvements. The amount of the bond o will be based on 120% of the City approved estimate for all right-of-way improvements. The City will inform you of the appropriate bond amount after review of the cost estimate. Bond forms can be obtained from Marie Harrison, Permit Coordinator –425-771-0220 or Harrison@ci.edmonds.wa.us Inspection fees for thisproject will be calculated at 2.2% of the 120% City approved o estimate for all improvements. May 1, 2013 –Please submit a traffic control planalong with the attached ROW permit 2. application. March 25, 2013 –Response comments state a contractor will be chosen soon and TCP and Haul Route will be provided at that time. February 12, 2013 –Plan not yet submitted. 12/6/2012–Response letter states TCP and haul route plan will be provided by contractor once selected for project. 8/13/2012 comment -Please submit a traffic control and haul route plan for review and approval. Sheet C-000–GENERAL NOTES 1.May 1, 2013 -On 4/15/2013 I received an email showing a revision to this sheet to include a site map and haul route. While the changes were found to be acceptable, I still need hard copies of the plans. Please submit 4 copies of this plan sheet. Sheet C-101–FRONTAGE IMPROVEMENTPLAN May 1, 2013 –WSDOT is requiring a WSDOT Construction Permit. Has this been obtained yet? Plans can be redlined to include a note that no work shall begin within the ROW until this has been secured. Page 2of 3 March 25, 2013 –response comment states “Plans have been submitted to WSDOT, no plan review response from them yet. February 12, 2013 –Copy of plans approved by WSDOT notyet received. 12/6/2012 comment -The City was recently informed by WSDOT that they would like to see improvement plans that involved removal and replacement of curb sections. Please submit the frontage improvement plan to WSDOT for review and approval or deferral back to the City. Sheet C-110–UTILITY PLAN May 1, 2013 –While reviewing the cost estimate I realized the plans do not specify the 1. size/type of storm CB’s and Manholes to be installed with the project. Please revise the Utility Info section to include this additional information. Please note on plans that DCDV vault shall be located entirely on private property. Please 2. also note that vault lid shall be non-slip for pedestrian use. Please contact me at 425-771-0220 or by e-mail at jeanie.mcconnell@edmondswa.govif you have specific questions regarding these plan corrections. Page 3of 3