bld20120455-Chase_Bank-E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:August 13, 2012 TO:Norm Scheg –norms@aaieng.com Craig Harris –craigh@aaieng.com FROM:Jeanie McConnell, Engineering Program Manager RE:Application#:bld20120455 Project:Chase Bank –New Bank Project Address: 9801Edmonds Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. City of Edmonds handouts,standard detailsand development codecan be referenced on the City website. GENERAL 1.Please provide an itemized engineers cost estimate, including units and unit prices,for both on- site and off-site (right-of-way) improvements, including traffic control.The City recommends use of the King County Site Improvement Bond Quantity Worksheet. A bond is required to be placed for all right-of-way improvements. The amount of the bond o will be based on 120% of the City approved estimate for all right-of-way improvements. The City will inform you of the appropriate bond amount after review of the cost estimate. Bond forms can be obtained from Marie Harrison, Permit Coordinator –425-771-0220 or Harrison@ci.edmonds.wa.us Inspection fees for this project will be calculated at 2.2% of the 120% City approved o estimate for all improvements. 2.Please submit a traffic control and haul route plan for review and approval. 3.Please include a City Engineering Division approval block. 4.The following project site is part of a subdivision in which specific engineering requirements have been established. These requirements include frontage improvements along Edmonds Way. The subject submittal does not include specific information/details related to these improvements. If the intent is for these improvements to be completed as part of the subdivision process then the plans shall reference the other permit approval process. Please note that the subject development will not receive final approval until the frontage improvements are completed.If the frontage improvements are to be constructed as part of the Chase Bank project bld20120455-Chase_Bank-E1.docPage 1of 6 then please provide a Frontage Improvement or Site Development plan sheet within the civil plan set.Sheet A100 appears to be of a true site plan (versus site development plan) that shows lot/building layout, height calcs, setbacks, etc. 5.Please also include with the frontage improvement plan a cross section adjacent to the parking lot parcel as well as the Chase Bank parcel showing curb, landscape strip with street trees, sidewalk, rain garden and parking lot/building. 6.Please provide a striping plan that dimensions parking stalls and drive aisle widths and provides details for directional arrows and signage. 7.Please be aware that any easements proposed as being granted to the City of Edmonds will need to go through a City Council process of approval prior to building permit issuance. Once easement areas have been determined please provide legal document exhibits for each. The City will assist with the easement form at point. Storm Drainage Report The following comments(noted inred below)are provided from Jerry Shuster, Stormwater Program Manager in response to the relevant storm comments provided in an email from Craig Harris dated June 11, 2012 and provides an additional comment on the future maintenance of the propose infiltration system. Please contact Jerry directly with any questions you may have on these comments. Both parcels will be served by a single stormwater flow control/treatment system. As part of final approval, a legal document outlining the maintenance responsibilities for these systems will need to be submitted. The City inspects these facilities and needs to know who is responsible for their property operation and maintenance. Please note, the City only has a preliminary stormwater site plan on file (dated May 1, 2012) and therefore a new review of the storm design was not possible with this plan review. Page 2of 6 Page 3of 6 Page 4of 6 Sheet C1.0 –GENERAL NOTES 1.Please update item #1 under general notes to state 2012 WSDOT specs instead of 2010. 2.Revise note #20 to include a requirement for compost amended soils consistent with City requirements. Please refer to handout E72C. 3.Include a Sheet Index 4.Callout Utility Purveyor Information Sheet C1.1–EXISTING CONDITIONS AND DEMOLITION PLAN 1.Revise plan sheet to more clearly show existing sidewalk limits. 2.Show removal (and replacement) of existing driveway approaches and curb ramps. 3.Callout individual signs that are indicated for removal and replacement. 4.Revise note 20 to state sewer shall be cut and capped at the property line. Sheet C2.0–GRADING AND EROSION CONTROL PLAN 1.Silt fence shall be installed on private property. Existing sidewalk shall remain open for as long as possible. Please revise plans. 2.Rock construction entrance shall also fall within limits of private property. Add note to leave existing asphalt approach in place until it becomes absolutely necessary to remove. 3.Indicate on site where materials will be stored. 4.Will a chainlink fence be installed around the perimeter of the work zone? Will access to PCC be limited to the western most entrance? Please add signage as necessary to provide clear direction to motorists. Sheet C3.0–UTILITY PLAN 1.The subject development falls within the Olympic View Water and Sewer District for the water utility system. Please provide a separate plan sheet for the water utility system with an approval block for OVWSD. Approval by the District will be required prior to issuance of the subject building permit. 2.A portion of the proposed water system is shown to be located within the City right-of-way. Please move to private property. 3.The DCDA is shown to be located within the City sidewalk. Please include details of the access hatches on the water utility plan sheet. 4.Please work with OVWSD to locate as many of the water system components outside the sidewalk area (or near the building) as is possible. 5.Add note with leader arrows that shows relocation of FH from one location to the next. 6.Several rain garden notes reference C4.0 for details, but not all rain gardens will have the drywell component. Please revise accordingly. 7.Please provide rain garden outfall details. Will outfall have a rip rap pad? 8.Include a detail of flow control manhole 2 in the plan set. 9.Revise plans to show storm easement to be granted to the City. No other utilities shall be located within the easement area. 10.In addition, please show easements (utility, access, etc.) that will exist between the north parcel and the south bank parcel. Page 5of 6 11.The retaining wall drain line appears to be shown on the parcel to the east. Will an easement be obtained from this property or is the drain line on the subject property? Will a construction easement from the property to the east be necessary? 12.Storm bypass system shall be installed with straight runs between catch basins. Where bends are needed a catch basin shall be provided. At a minimum, please provide one additional CB (at the approx. midpoint) in the storm bypass system. 13.A note on the downspouts has been added to the plans near the teller drive-thru lanes, but the note is covered by storm pipe. Please revise plans so note is legible. 14.A vent pipe is shown between the stormtech detention system and a landscape island, but the vent does not appear to be consistent with the detail provided on sheet C4.2. Please revise accordingly. 15.It appears as though a water meter has been shown to the west of the storm vent pipe/landscape planter. Please confirm what this symbol is representing and if it’s shown in the correct location. 16.Please include parking lot light head in legend. Sheet C4.0–CONSTRUCTION DETAILS 1.Curb along Edmonds Way is vertical curb and shall be constructed per WSDOT standards. Please include a WSDOT detail for vertical curb and reference accordingly on site development plan. 2.Driveway approaches shall also be constructed per WSDOT standards. Please incorporate standard detail that includes adjacent landscape strips. 3.City of Edmond standard detail for sidewalk (E2.13) shall be included in the plan set for reference to subgrade and sidewalk thickness, but asite specific detail will need to be included to show the landscape strip. Sheet C4.3–CONSTRUCTION DETAILS 1.Remove City of Edmonds water system details and replace with OVWSD standard details. OVWSD details shall be provided on a separate plan sheetso they can be approved by the District. Please contact me at 425-771-0220 or by e-mail at mcconnell@edmondswa.govif you have specific questions regarding these plan corrections. Page 6of 6