CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:February 25, 2015
TO:Greg Guillen
grego@cgengineering.com
FROM:Jeanie McConnell, Engineering Program Manager
jeanie.mcconnell@edmondswa.gov
RE:Application#:bld20120455
Project:Starbucks –Revision from Bank to Starbucks
Project Address: 9801 Edmonds Way
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to a permit coordinator.
City of Edmonds handouts,standard detailsand development codecan be referenced on the City
website.
Comments 1 –November 20, 2014
Comments 2 –February 25, 2015
GENERAL
February 25, 2015 –Thank you for providing a cost estimate. I have not yet had a chance
1.
to review this, but will do so shortly and follow-up with any comments.
November 20, 2014 comment -Please provide an itemized engineers cost estimate, including
units and unit prices, for both on-site and off-site (right-of-way) improvements, including traffic
control.The City recommends use of the King County Site Improvement Bond Quantity
Worksheet.Please utilize the King County Site Improvement Bond Quantity Worksheet to
complete the estimate.
A bond is required to be placed for all right-of-way improvements. The amount of the bond
o
will be based on 120% of the City approved estimate for all right-of-way improvements.
The City will inform you of the appropriate bond amount after review of the cost estimate.
Bond forms can be obtained fromPermit Coordinators Linda Thornquist or Kristin Johns at
425-771-0220 or by email at linda.thornquist@edmondswa.govor
Kristin.johns@edmondswa.gov
Inspection fees for this project will be calculated at 3.3% of the 120% City approved
o
estimate for all improvements.
2.ok
bld20120455-Starbucks-E2.docx Page 1of 3
February 25, 2015–Please include approval block on all plan sheets(at least those being
3.
resubmitted). I can stamp other sheets as needed.
11/20/2014 comment -Please includeCity of Edmonds approval block:
STORMWATER REPORT
The following comments are provided from Jerry Shuster, Stormwater Engineer. Please
contact Jerry directly at 425-771-0220 or by email at jerry.shuster@edmondswa.govwith any
specific questions you may have regarding these comments.
The original design of the stormwater system for the adjacent Walgreens site took into account development
of this parcel as a bank.The table in section 5.E of the Stormwater Site Plan Report (CG Engineering
January 2015) indicates that the total impervious area will be reduced by 1,766 square feet for the proposed
Starbucks development compared to the bank development.The runoff from the Starbucks site will be
directed to the approved infiltration chamber system for the Walgreens/Bank, therefore, there is no addition
stormwater requirement for the Starbucks site.From a telephone conversation with James Ellis of CG
Engineering on February 13, 2015, the proposed bioretention cell was requested by the client for inclusion in
their LEED certification.
The following are general comments on the design:
Section 5.D of the Stormwater site plan states that the bioretention cell was modeled using an
infiltration rate of 6 in/hr.Since WWHM3 was used to model bioretention cell with the infiltration
trench/bed module, the porosity of 0.4 accounts for the bioretention soil.The infiltration rate should
be the native soil infiltration rate, not that of the bioretention soil mix.Since the Walgreens site used
10 in/hr for infiltration chambers for the native soil infiltration rate, 6 in/hr is conservative, so it is
OK.Also, The use of sidewall infiltration should only be used if slopes are shallower than3:1 and
the “Precipitation Applied to Facility” and Evaporation Applied to Facility” boxes should be checked
in the WWHM3 modeling , since it is an open pond (could not be verified).
Section 5.E of the Stormwater site plan states the project will have0.153 acres (6,655 square feet) of
pollution generating impervious surface (PGIS) area .The table in this section of the report states
there will be 11,124 square feet of PGIS.Please reconcile.
Bioretention cells for treatment have 18 inches of bioretention soil mix not 12 inches.
There have been issues with the bioretention cells on the adjacent PCC property where cars have
gone over the curb into the cell.Consequently, split-rail fences were constructed.The need for such
a fence should be evaluated.
Since the bioretention cell is not required by the City, the designer might consider sizing it for only
the roof runoff.This would shrink its size, possibly reducing the impact on site traffic and may still
help with the LEED certification.
Sheet C1.1 –COVER SHEET AND GENERAL NOTES
1.ok
2.ok
Page 2of 3
Sheet C2.1 –TEMPORARY EROSION CONTROL PLAN
1.ok
2.ok
3.ok
Sheet C3.1–GRADING, DRAINAGE AND PAVING PLAN
1.ok
2.ok
3.ok
4.ok
5.ok
6.ok
7.ok
8.ok
9.ok
10.ok
11.ok
12.11/20/2014 comment-Add reference to which plan sheet the detail for the trashenclosure can
be found.
a.ok
February 25, 2015–Sheet A-5009 has been referenced for trash enclosure
b.
details. The details in the architecturalset show the drop pinsleevesin the
closed gate position, but not in the open gate position.A note can be added
(redline is fine) to the civil set to address this.
11/20/2014 comment -Drop pin sleeves shall be installed at both open and closed
gate positions.
February 25, 2015–The detail on Sheet A-5009 does notappear to provide
c.
dimensions for the concrete pad. Please revise accordingly (civils or
architectural)
13.ok
14.ok
February 25, 2015–In the last plan review I did not pick up on the sub-standard parking
15.
stalls shown in the NW corner of thenew parking lot. Standard parking stall dimensions
are 8 ½’x16½’. Please adjust curb on the north south to allow for a 16 ½”length stall.
February 25, 2015 –Please show continuation of theRPM’s,dividing the drive through
16.
lane from throughtrafficalong thenorth side of theproject,to thecurb to the east.
Sheet C4.1–WATER AND SEWER PLAN
1.ok
2.ok
Page 3of 3