Loading...
BLD20120502-Johnson_ENG1.pdf City of Edmonds BLD20120502 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Permit Application :Date: # BLD20120502 August 1, 2012 Project Name/Address: Johnson – 843 Hindley Lane Contact Person/Address, Fax or E-mail: robbclj@hotmail.com Reviewer: JENNIFER LAMBERT Division: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1)Please show how you will prevent the runoff from the existing concrete driveway from running onto the existing asphalt driveway and vise versa. 2)Please show filter fabric surrounding the trench in the infiltration trench detail. 3)Please revise the washed rock note “1-1/2” to 1/34”” to 1-1/2” to 1-3/4”. 4)It appears from the plans that the intent is to leave the washed rock to finished grade is this correct or do you intend to cover the trench with soil/grass? Comments from Jerry Shuster, P.E., Stormwater Eng Program Mngr $± ¨­ ¦¤2¤¯®±³ %£¬®­£² 3³®±¬¶ ³¤±#®£¤3´¯¯«¤¬¤­³ DATE E-MAILED 7/15/10 PAGE(1) City of Edmonds BLD20120502 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Please resubmit 3 copies of the revised traffic control plans and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 ext 1321 or by e- mail at jennifer.lambert@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 7/15/10 PAGE(1)