Loading...
bld20120561_Ardsley_ENG1.pdf City of Edmonds BLD20120790 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Permit Application :Date: # BLD20120790 October 31, 2012 Project Name/Address: Ardsley Homes, LLC Contact Person/Address, Fax or E-mail: terri@sundquisthomes.com Reviewer: JENNIFER LAMBERT Division: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: Stormwater / Utility / Grading Plan Construction Sequence: 1)Please remove #1, a pre-construction meeting is not required. Erosion and Sediment Control (ESC) Notes: 1)Note #1 - Please remove crushed rock from the option of a construction entrance . 2)Note #1 - Please reference Edmonds Standard Detail E1.2. Drainage Construction Notes: 1)Note #1 - Please remove crushed rock from the option of a construction entrance . 2)Note#2 – Please remove. Utilities: 1)Please note what size pipe and the pipe material that will be used for the side sewer. 2)Please add a note that a 12” cast iron lamphole cover with ½” hexbolts is required at the cleanout a the property line. 3)Please show the water service line from the house to the meter. 4)Please note what size pipe and the pipe material that will be used for the water service line. DATE E-MAILED 10/31/2012 PAGE() 1 City of Edmonds BLD20120790 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 5)Please note that a tracer wire will be added to the water service line. 6)Please show the path of the phone, cable, power, and gas from the main line to the house to verify that 3’ separation can be met between the utilities and the water service line. 7)Please add note that all new utilities must go underground. Drainage: 1)Please note that the drainage can not be reviewed at this time. An infiltration rate must be determined by a licensened engineer. Once this information is submitted, Engineering will continue the review of the proposed stormwater system. Traffic Impact Analysis: Per Chapter 18.82 – Traffic Impact Fees of the Edmonds Community Development Code (ECDC), traffic impact fees shall be required. 1.Please complete numbers 1 and 7 of the Traffic Impact Analysis Worksheet from City of Edmonds handout #E82, “Traffic Impact Analysis Requirements” (attached). Please resubmit 3 copies of the revised traffic control plans and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 ext 1321 or by e- mail at jennifer.lambert@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 10/31/2012 PAGE() 2