Loading...
BLD20120629_McmanusStudio-2nd.pdf CITY OF EDMONDS th 121 5Avenue North,Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.EdmondsWA.gov DEVELOPMENT SERVICESDEPARTMENT•PLANNING DIVISION DATE:October16, 2012 TO:Rod Wickham:rad.design@hotmail.com BLD20120629 RE:Planning Division comments for file »McManus StudioAddition Greetings, studio addition7400 Braemar Drive RS-20 Thank you for submitting a building permit application for a at in the zone. I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed before the Planning Division review can continue. 1.Setbacks: I have requested the setback adjustment file from archives, file A-23-1981.Please plan on redesigning the second story to meet the required setbacks (10’ minimum, 35’ total from each side).There is the slight possibility that the language of the approval would allow you to proceed as planned, but in most situations, a variance is approved based on the plans submitted at the time of construction and does not carry over to future additions. Fingers crossed! 10/16/2012:Please apply for and obtain a variance for the proposed addition, or modify the proposal to meet the required setbacks. The previous variance does not applyto future construction, which is required to meet the various codes in place at the time of a complete buildingpermit application. You are proposing to modify a legal nonconforming structure, and per ECDC 17.20.020.Baltering the structurewithin the setback area (most of the second story) is not permitted.I’m sorry that this isn’t the news that you wanted to hear. 2.Land Use: Please clarify the use of this new studio addition.Please state if you plan to use this as an accessory dwelling unit (ADU) and I will be happy to guide you through the ADU process.If this space will not be an ADU, please label “not anADU” on the plans (redlining them with your initials and the date is acceptable). 10/16/2012:If you are not creating an ADU, what use will be conducted within the “studio”?Please clarify. : Please submit a written response to the above, along with any revised plansto your Permit CoordinatorLinda Thornquist. All code citations can be found at:www.EdmondsWA.gov.If you have any questions, please do not hesitate to contact me. I look forward to working with you on this project. Sincerely, Gina Janicek:: Associate Planner City of Edmonds Development Services Department th 121 5Avenue North, Edmonds WA 98020 425.771.0220 x 1778 | gina.janicek@edmondswa.gov cc:BLD20120629 1|Page