Loading...
bld20120655_kidd-3.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20120655 August 16, 2013 Project Name/Address: Kidd New Single Family Residence 932 Olympic Way Contact Person/Address/Fax: Tony Shapiro tonys@adshapiro.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: C101: Stormwater/Utility Plan: 1. 8/16/13 Partially Completed. There is reverse fall between the roof drains at the corner of the house and the connection south of the driveway. Please revise. 2. 8/16/13 Not Done. Foundation drains shall connect to the storm system after the control structure. Regardless of the configuration you choose, the footing drains need to be combined on site and connected after the control structure of the detention system. It appears that if the detention system is slightly shifted the fd connection can be made before the property line. This would also negate the need to extend the shared line in the easement past the proposed catch basin. If there are circumstances that require separate connections outside the property line, please provide a written response. 3. 8/16/13 Done After discussions with the City Stormwater Engineer, the attached configuration may help reduce the extreme pipe slopes and meet the stormwater system development requirements. This is only given as a possible option. If used, It is the responsibility of the Engineer of Record to verify the feasibility of the option. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 8/16/2013 PAGE _1__ OF _1_