bld20120802-Meyring_ENG3.pdf
City of EdmondsBLD20120802
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.edmondswa.gov
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
PermitApplication:Date:
#BLD20120802 April 3, 2013
th
Project Name/Address:
Meyring –21415-96Ave W
Contact Person/Address, Fax or E-mail:
BradleyMeyring
Reviewer: JENNIFERLAMBERTDivision:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.usunder City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
St
1Review –10/12/12
nd
2Review –12/28/12
rd
3Review –4/3/13
1)4/3/13 –Comment was not addressed.
12/28/12 –Comment was partially addressed. A Sheet was provided stating the impervious surfaces;
however, the chart was not added to the plans. Please add the chart to the plans.
10/12/12 Comment: Please show the impervious surface calculations as shown below:
LineTypeArea (square feet)
1.Non-Regulated
ExemptRegulated
2.Replaced
3.New (Post 1977)+
Total Regulated Impervious Area
=
4.
Mitigation required if in excess of 2000sf
-
5.Total Area Mitigated by Existing Stormwater Management System(s)
6.Regulated Area Not Yet Mitigated=
7.Area Proposed to be Mitigated by Low Impact Development Techniques=
8.Area Proposed to be Mitigated through Conventional SWM Techniques=
1| Page
City of EdmondsBLD20120802
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.edmondswa.gov
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
2)OK
3)OK
4)OK
5)OK
6)OK
7)OK
8)4/3/13 –Comment was partially addressed. The side sewer must be shown to the house. If the
addition is being constructed over the existing side sewer a sewer permit will be required and a
cleanout will be required to be added to the line such that there is a cleanout within 2’ of the
structure. The portion of sewer that will remain under the new addition will need to meet
building code requirements.
12/28/12 –Comment was not addressed.
10/12/12 Comment: Show the location of the side sewer from the sewer main to the house.
9)OK
10)4/3/13 –Comment was not addressed.
12/28/12 –Comment was not addressed.
10/12/12 Comment: Please provide grading calculations.
a.
Please show bottom of footing elevations so that grading calculations can be verified.
12/28/12 –Additional Comments
11)OK
12)4/3/13 –Comment was not addressed.
12/28/12 Comment: Is the outline of the structures the foundation footprint or the roofline? Please
show the roofline and label the roofline on the plans.
13)4/3/13 –Comment waspartially addressed. It appears that the scale was changed; however, it
does not appear to be correct. It most of the dimensions it appears that the scale is closer ot 1/2” =
2| Page
City of EdmondsBLD20120802
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.edmondswa.gov
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
10’, but when looking at the dimensions of the property line to the structuresthat scale does not
appear to work. Please revise the plans accordingly.
12/28/12 Comment: It is written that the drawing is scaled 1” = 20’. In using this scale the proposed
addition is scaling to 1209 sqft.
a.
If this is correct, please revise the impervious surface calculations accordingly.
b.
If this is not correct, please fix the drawings so that it can be scaled.
14)OK
15)OK
Please resubmit 3 copies of the revised SitePlansand associated documents with a written response to
each item to the Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at
jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections.