Loading...
bld20120895_Borgeson_ENG2.pdf City of Edmonds TH 121 5AVENUE NORTH •EDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKSDEPARTMENT EngineeringDivision Plan Review Corrections Plan Check :Date: #BLD201200895May 24, 2013 th Project Name/Address: BorgesonSFR7822 240St SW Contact Person/Address/Fax: Scott Borgeson–Community Builders Group scott@borgeson.us___ Reviewer:Jennifer Lambert Division:Engineering During review of the subject submittal,it was found that the following information, corrections, or clarifications wouldneed to be addressed. All Handoutsand Standard Detailsreferred to in these comments can be accessed at our website: www.ci.edmonds.wa.usby clickingCity Government / City Department / Public Works/ EngineeringDivision: Review 1 –11/16/12 Review 2 –5/24/13 Short Plat Requirements 1.5/24/13–Applicant responded to comment;however, the City has not found any evidence that there was a fee paid to the City for sidewalk improvements at a different location. When looking at the short plat file there was a cost estimate completed that shows that a bond would need to be in place for the short plat improvements in order to record the short plat. In the cost estimate used to calculate the bond amount the curb/gutter and sidewalk was calculated at $25LF *90 ft.= $2250.00. Please provide documentation (i.e. receipt of payment, etc.)showing proof that there was a payment made or show on the plans the installation of curb/gutter and sidewalk. Comment 11/16/12 -The sidewalk and Curb/Gutterwas deferred to the constructionof the short plat.As stated in the Engineering Requirement of the subdivision S-99-238recording number #200101295001, 5’sidewalk and curb/gutter shallbe installedas a condition of subdivision th along the frontage of 7822 and 7824240St SW. Please show required improvements on site plan and add City of EdmondsStandard Details E2.26, E2.28 and E2.13. Plot Plan 1.OK DATE FAXED/E-MAILED5/24/2013PAGE ___ OF __ 14 Additional Comment 5/24/13: 2.It appears from the plans that a portion of the proposed driveway slope exceeds 14%. Per Edmonds Code 18.80.060.D, no portion of the driveway may exceed 14%. Please revise plans accordingly. Site, Drainage, TESC,and Utility Plan Erosion Control: .5/24/13–Comment was addressed; however, please revise the note (shown within the 1 property lines of lot 1) to be consistent with note 4 under the Storm Drainage & TESC Note. 11/16/12 Comment: A temporary construction entranceis required per City Standard detail E1.2. If the existingdriveway surface is to remain, the construction entrance may not be required; onsite parking for Lot 1 outside of the driveway surface must be provided during construction. Please revise plans to state what method you will use for your construction entrance. 3.OK Utilities : 1.5/24/13–Comment was partially addressed. There is an additional note written along the south BSBL line of Lot 1. Please remove or revise accordingly. 11/16/13 Comment: The leader for the water service line is pointed to the side sewer and property line. Please revise accordingly. 2.OK 3.OK 4.OK 5.OK 6.OK 7.OK DATE FAXED/E-MAILED5/24/2013PAGE ___ OF __ 24 Grinder Pump : 1.5/24/13–Comment was not addressed. It is true that the E-One is an acceptable pump. This means that the pump does not have to be peer reviewed; however, it is still required that a predesign report be submittedas outlined in handout #E62. 11/16/12 Comment: Please review Handout #E62 for requirements for a single family residential sewage pump. “Apre-design report to justify the installation of a pump station must be submitted to the City Engineer prior to design.” Checklist and standard details arealso providedin the handout. Requirements include “The engineer of record must be registered in the State of Washington and have had prior experience in designing similar systems to the satisfaction of the City Engineer. Qualifications shall be included within the design report.” The city has completed reviews and have approved the following packaged grinder pump stations: i.Myers ii.Barnes iii.Hydromatic iv.Zoeller 840 Series. If you intend to use the E-One model or a model not in the above list, the system will need to bepeerreviewedand associated fees will be applied. Please submit documentation that shows that the model you propose meets the requirements outlined in Handout #E62. 4.OK Drainage: 1.OK 2.OK 3.OK 4.OK 5.5/24/13–Applicant responded to comment; however, all runoff from impervious surfaces must be collected and directed to the stormwater management system. We understand the desire to protect the tree, but we believe there are other methods that can be implemented that allow for no disturbance to the tree or its root system (i.e. changing slopes of the driveway, add additional CB’s within the driveway, extend the curb to direct to CB’s, etc.). Please revise the plans accordingly. 11/16/13 Comment: Please add a catch basinat the bend of the driveway. This is to allow another area for the water to be collected to help prevent the amount of runoff that may enterthe garage in cases of overflows. DATE FAXED/E-MAILED5/24/2013PAGE ___ OF __ 34 Additional Comment: 6.Footing drains typically are not approved to drain to the onsite stormwater system. Please either: a.Have the engineer of record design the onsite stormwater system to allow for the collection of the water from the footing drains.(Please revise the stormwater management report for review). b.Or install a separate drywell as directed by the engineer of record. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator.Please contact me at425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED5/24/2013PAGE ___ OF __ 44