Loading...
bld20120895-Boregson-final-correction-notice-07.28.2015.pdf CITY OF EDMONDS CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:7/28/15PERMIT NUMBER:BLD20120895 OWNER:Scott BorgesonSITE CONTACT:Scott Borgeson th 7822–240St SW ADDRESS: TYPE OF INSPECTION:FINAL INSPECTION -SFR WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASEOF WORK IS STARTED. RECALL FOR INSPECTION REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR st 1Inspection –4/3/15 nd 2Inspection –6/2/15 rd 3Inspection –7/28/15 1)4/3/2015 - The frontage improvements need to be completed. 6/2/2015 –Sidewalk, curb, gutter and road widening improvements were constructed without required City inspections. Frontage improvements as constructed are not in compliance with the approved plans and/or City standards and shall be removed and replaced.The following standard details, available on the City website, are provided for reference. After demolition of the recently constructed improvements, the contractor shall schedule a pre-construction meeting with the City. In addition, all form work shall be inspected by the City prior to concrete pour. E2.26 –Standard driveway entrance E2.8 –Curb and gutter E2.13 –Concrete sidewalk E8.4 –Regulatory signage E8.5 –Mailbox layout Additional information pertaining to the frontage improvement installation has been provided at the end of this correction notice. 7/28/15 – a)The East asphalt ramp does not meet ADA standards. Remove and replace the asphalt ramp such that there is a 4’ landing and ramp. b)Fog line shall be restriped c)Provide a 2:1 slope at the back of the sidewalk 2)Asbuilts - OK 3)4/3/2015 - Cut the sewer cleanout located at the property line/right-of-way line to grade. 6/2/2015 –Correction not addressed. Discussed with contractor on site –need to have at final grade. 7/28/15 –The cast iron lamphole cover was installed; however, the plastic lid on top of the cleanout cannot be openedat this time. Remove the dirt from the top of the lid and replace the plastic irrigation lid with the standard PVC cap(gasket removed). 4)OK 5)OK 6)4/3/2015 - Expose the tracer wire at the meter so that we can verify that it is grounded. 6/2/2015 –Correction not addressed. Tracer wire could not be located. 7/28/15 –Not Addressed. 7)4/3/2015 - Clean out all catch basins. 6/2/2015 –Catch basins onsite looked okay. CB in ROW needs to be cleaned. Filter sock shall be in place at time of frontage improvement demolition and replacement. 7/28/15 –Catch basin in the ROW has not been cleaned out. 8)OK 9)OK 10)OK 11)OK 12)OK 13)OK 14)OK Page 2of 3 15)4/3/2015 -The City’s sewer department will complete an inspection on the sewer lateral and the channeling of the manhole next week. We will follow up if there are additional comments related to that inspection. 6/2/2015 –An inside drop was installed inthe sewer manhole in the City right-of-way, but does not comply with City standards. Please refer to standard detail E6.5 (attached) for drop bowl requirements. Instead of channeling the manhole, it would be acceptable to direct flows via pipe to the edge of the channel. Flows shall not be released on the shelf. 7/28/15 –Not addressed. 16)7/28/15 – A drainage swale with drain rock (from CB1 to CB2) was required as an overflow path per the approved plans. However, as shown in the photo below, this area was covered with crushed rock with fines. Please correct to be consistent with the approved plans. 17)7/28/15 – At the close of a project the number of inspections performed is reviewed against the number of inspections paid for. More inspections were performed on this project than what were paid for at the time of permit issuance. Prior to project final please pay the outstanding balance of $360. This includes 3 additional inspections on the right-of-way permit and 3 additional inspections on the building permit. For inspection scheduling call 425-771-0220 x1326. Page 3of 3