Loading...
bld20120952_behar-1.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20120952 November 1, 2012 Project Name/Address: Behar Co Plumbing 22001 Highway 99 Contact Person/Address/Fax: Kitty Singh 206-783-0334 kitty@sismech.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. 1. Please provide a site plan showing the new utilities to be installed (water, sewer, storm) from the building to the connections at the property line or to city utilities in the right of way if a new connection will be made. Show all existing utility locations. all 2. Call out on plan length, size and material of pipe to be installed. 3. Show the rpba location. 4. Provide a traffic control plan for closing sidewalks or road if necessary for this work. 5. Where will the proposed downspouts be directed? Show and label where they will be added. Show and label all tightline runs. Show all new connection to catch basins or other structures. All connections shall include invert elevations. 6. Sanitary sewer line for commercial use is required to use 6” conveyance pipe. It will be necessary to replace existing 4” pipe. 7. Call out size and location of sewer clean outs. Clean outs are required at the building, every 100 ft, and at the property line. All clean outs in drivable areas and at property line shall have a 12” cast iron lamphole cover with ½” hexbolts. Note on plans. 8. Add and label on plan where the hose bibs will be installed. Show connecting pipe if exterior connection. 9. Pipe for grease interceptor conveyance shall be 6”. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 12 Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 22