bld20120952_Email Question 11.5.12.pdf
Zulauf, JoAnne
Steve Johnson <sjsmechanical@yahoo.com>
From:
Monday, November 05, 2012 3:38 PM
Sent:
Zulauf, JoAnne
To:
Fw: BLD20120952
Subject:
See below.
Thank you,
Steve Johnson
SJS Mechanical Services LLC
Phone: 206 763-0334 Fax: 206 763-0442
Cell Phone: 206 595-3481
Email: sjsmechanical@yahoo.com
**PLEASE NOTE OUR NEW ADDRESS BEGINNING MARCH 1st: 3317 3RD AVENUE SOUTH, STE. 100, SEATTLE,
WA 98134
This e-mail message is intended only for the named recipient(s) above.
It may contain confidential information. If you are not the intended
recipient, you are hereby notified that any use, dissemination,
distribution or copying of this e-mail and any attachment(s) is strictly prohibited.
----- Forwarded Message -----
From: Steve Johnson <sjsmechanical@yahoo.com>
To: "zulauf@ci.edmonds.wa" <zulauf@ci.edmonds.wa>
Cc: Gustaf Holmberg <Gustaf_Holmberg@abossein.com>
Sent: Monday, November 5, 2012 3:33 PM
Subject: BLD20120952
JoAnne,
I need some clarification on your comments. My comments / questions follow - they don't necessarily relate 1 to 1 to your
comment #'s.
a) This is an existing building and we are utilzing the existing sanitary and storm system - we are tying into existing on the
property. We are replacing some bad pipe (storm on south side of the building and tying in some small canopy drains to
this piping. We have camera'd and jetting both the storm and sanitary lines and they appear in good condition. We did not
plan on upsizing any pipe within the property lines. Not sure what you mean by conveyance? Do you want us to show an
additional catch basin??
b) Water service - yes we are going to upsize the service, but we are assuming that any work on the sidewalk or street
side of the meter will be done by the city or the water district. So we would not need to block the streets or sidewalk for
our work - inlcuding the backflow preventer install.
c) Why do we need to call out length of pipe - No tenants are in the space - the piping shown is more than adequate - 2"
water and 4" waste for just about any buildout.
d) Grease Interceptor - this is shown more for the owner than for anybody - it is a place holder. We would go in for
separate permit for the grease interceptor once it was approved. We will just be having the piping + cleanouts to the future
grease interceptor inspected.
Call if it would be easier to discuss.
Thank you,
Steve Johnson
SJS Mechanical Services LLC
Phone: 206 763-0334 Fax: 206 763-0442
Cell Phone: 206 595-3481
Email: sjsmechanical@yahoo.com
**PLEASE NOTE OUR NEW ADDRESS BEGINNING MARCH 1st: 3317 3RD AVENUE SOUTH, STE. 100, SEATTLE,
WA 98134
This e-mail message is intended only for the named recipient(s) above.
It may contain confidential information. If you are not the intended
recipient, you are hereby notified that any use, dissemination,
distribution or copying of this e-mail and any attachment(s) is strictly prohibited.