Loading...
bld20121024_Simpson-3.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20121024 May 10, 2013 Project Name/Address: New Single Family Residence 626 Maple St. Contact Person/Address/Fax: Scott Simpson scotsimpson@comcast.net Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: Plan 2: Stormwater/Utility Plan: 1. The drywell detail provided show a catch basin but none is shown on the plans. Add to plans, note size and add pipes for connections. All structures and pipe shall be labeled with size, type, length, material. a. Please revise the sizing of the drywells. It appears that the diameter was multiplied by 2 for the circle SF calculation instead of using the radius. (2 r pi). Please resize drywells to meet design requirements. This info can be redlined on the plans. 1. Add invert elevations at both clean outs and call out length of pipe to verify minimum slope of 2% is achieved. If installing new lateral, invert elevations at connection to main shall also be provided on plan. a. Still need the invert elevation where the side sewer will connect to the main on the adjacent property. This info can be redlined on the plans. b. Also need a copy of the easement allowing your side sewer to cross the neighboring property. If there is not an official easement already in effect then the minimum requirement for plans approval would be to provide the city with a letter from the adjacent homeowner acknowledging the need for the easement and indicating that they will be willing to sign an easement for this sewer crossing. In this case, a formal easement will need to be completed, signed and recorded prior to the final of construction. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 11