bld20121057-Swedish-Detention_Vault-CG-Structural-Final.pdfENGINEERlING
December 281h 2012
Jeanie McConnell
CityofEdmonds—Pub|icVVodoDepartment
1215^'Avenue North
Edmonds, \NA9OO2O
City ofEdmonds Task OrderNo: 12-01
Task Title: Swedish Cancer Institute — Detention Vault Structural
Dear Ms. McConnell,
CG Engineering provided a re -review for the above referenced project based upon the
following items which were provided by the City:
* 0dcast|e Precast Comment Response Letter dated 12/18/12
* KPFFComment Response Letter dated 12/21/12
*0dcast|ePrecast Detention Vault Drawings (Drawing #O10-S1O9895-UU1Sheets 1
thru32) dated 8/31/12
* 0|dcast|e Precast Structural Design Calculations dated 12/17/12
* Perkins+VVi||Architectural Site Plan A-0101dated 12/17/1Z
It appears that the comments noted in our review latter dated December 7 th were
addressed and CGEngineering has nofurther comments,
if you have any questions or comments regarding this review please do not hesitate to
call.
Sincerely,
CG Engineering
Greg GuiUen,PE, SE
Principal