BLD20130190-Chang_ENG2.pdf City of Edmonds TH 121 5AVENUE NORTH •EDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORKS DEPARTMENT EngineeringDivision Plan Review Corrections Plan Check :Date: #BLD20130191July 3, 2013 Project Name/Address: Change –17134 Talbot Rd Contact Person/Address/Fax: Jonathan Richards –jonathan_59@hotmail.com Reviewer:Jennifer LambertDivision:Engineering During review of the subject submittal,it was found that the following information, corrections, or clarifications wouldneed to be addressed. Our handouts can be found online at the City of Edmonds web site www.edmondswa.govunder the permit assistance menu. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. st 1Review: 3/28/13 nd 2Review: 7/3/13 Site Plan: 1.OK 2.OK Grading, TESC Plan: 1.OK 2.OK 3.OK 4.OK 5.OK 6.OK DATE MAILED/FAXED7/3/2013PAGE ____ OF ___ 13 7.OK 8.OK 9.OK Drainage, Utility plan: General: 1.OK 2.OK 3.OK 4.OK 5.OK 6.OK 7.OK 8.OK Utilities: 1.OK 2.7/3/13: Comment was addressed; however, becausethe sewer runs through the adjacent parcel an easementis required. Please provide this easement or provide aletter stating that theadjacent property owner agrees to the easement and that it will be obtained prior to final approval of the new single family residence. 3/28/13 Comment: Please show the proposed sewer linefrom the main to thehouse. a.If you intend to re-use the existing sewer lateral, please add the following note: “If re-using the existing sewer lateral the conditionof the pipemust be verified by City’s Public Works Dept. Contact Edmonds Sewer Division 425-771-0235”. Please also note that the lateral must be 6” to re-use. b.Please show all invert elevations at the cleanouts and at the connection to the main. c.Please show the 6” cleanout (with 12” cast iron lamphole cover and ½” hexbolts) at the property line. d.Please show a cleanout within 2’ of the house. e.Please note whatpipe material will be used for the sewer. 3.OK 4.OK DATE MAILED/FAXED7/3/2013PAGE ____ OF ___ 23 5.OK Drainage: 1.OK 2.OK 3.OK 4.OK 5.7/3/13 –Comment was not addressed. 3/28/13 Comment: As noted in the Geotech Report, the preferred option is to discharge collected stormwater to an existingstorm line (either across neighboring private property or to BNSF property). a.Please statewhy this cannotbe achieved. b.The City Stormwater Engineer has expressed concerns with full dispersion on this property given the steep slope. c.If the plans are revised to show the collected water from the subject property discharging through the neighboring property or BNSFthe following will be required: i.Approval letter from neighboring property and/or BNSFand subsequent recording of an easement, ii.A downstream analysisprepared by a licensed engineershowing that the additional flows can be handled inthe existingsystem. 6.7/3/13 –Comment was not addressed. 3/28/13 Comment: Please provide a letter from the GeotechnicalEngineer confirming the proposed stormwater system (including the release of the perimeter footing subdrain system) complies with the Liu & Associates, Inc, report dated 9/15/12. 7.7/3/13 –Comment applicable if infiltration is proposed. 3/28/13 Comment: If anyinfiltration is to occur on this lot, the Geotechnical Report will need to be revised to include recent infiltration testing on the subject site. The report relies on testing done on the adjacent site completed 17 years ago. Additional Comments: 7/3/13 1.The size of the raingarden needs to be designed per the City’s Handout #E72B. Please revise the plans accordingly. 2.Please specify the plants and soils to be used for the raingarden on the plans. DATE MAILED/FAXED7/3/2013PAGE ____ OF ___ 33