Loading...
bld20130211-Dent_ENG1.pdf City of EdmondsBLD20130211 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20130211 April 24, 2013 th Project Name/Address: Dent –16330–75Ave W Contact Person/Address, Fax or E-mail: Paul Dent –paul@griffinmaclean.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1)The scale on the Civil plans provided is not accurate. Please revise the plans accordingly. 2)On the Site Plan a deck is shown on the plans. On the Civil Plans a patio is shown on the plans. It appears that there is an existing deck above an existing patio. a.Please revise the plans to be consistent showing and/or noting boththe deck and the patio. b.Is thedeck, to be replaced? c.Per the impervious surface calculations it appears that the patio will be replaced, please note on the plans “existing patio to be replaced in exact location”. d.If the patio is to be enlarged thoseareas will be considered new impervious and the impervious surface calculations will need to be noted as such. 3)Please clearly label(maybe differ thehatching) the proposed driveway and the existing driveway. 4)If the existing driveway is to be replaced, please note that the existing driveway will be replaced in the exact location. If the driveway is widened those areas will be considered new and the impervious surface calculations will need to be revised accordingly. 5)Please fill out the stormwater worksheet providedin handout #E72and submit with plans. 6)Please show the year of construction forall impervious surfaces on the Site Plan. 7)Please note that special inspections will be required for erosion control throughout the project. DATE E-MAILED4/24/2013PAGE(1) City of EdmondsBLD20130211 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 8)Please note thata special inspection will be required for all work conducted within the BNSF right-of-way in accordance with the Pipeline License date 1/23/13and City of Edmonds requirements. 9)Please note that if the storm line is 20% or greater the line will need to beanchored. Please show the locations where the storm line will be anchored. 10)Please add a note that if the rim to invert exceeds 5’ a type II catch basin will be required on the storm line. 11)Please show the limits of the City Sewer (8306230279-10’) and AccessEasement(8301200190 – 10’)and note the recording number on the plans (Site Plan and Civil Plans). 12)Show the location of the side sewer from the sewer main to the house. 13)Please show the location of the water service line from the house to the meter. 14)Pleaserevise the title of the Erosion Control Plan to including Grading. 15)Please provide grading calculationson the erosion control plan. a.Please show bottom of footing elevations so that grading calculations can be verified. Please resubmit 3 copies of the revised SitePlansand associated documents with a written response to each item to the Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED4/24/2013PAGE(1)