bld20130211-Dent_ENG2.pdf City of EdmondsBLD20130211 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20130211 April 24, 2013 th Project Name/Address: Dent –16330–75Ave W Contact Person/Address, Fax or E-mail: Paul Dent –paul@griffinmaclean.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: st 1Review –4/24/13 nd 2Review –7/11/13 1)OK 2)OK 3)OK 4)OK 5)OK 6)OK 7)OK 8)OK DATE E-MAILED7/11/2013PAGE (1) City of EdmondsBLD20130211 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 9)7/11/13 –Comment was addressed; however, there are a few additional questions. a.The detail provided from the King County Manual states that ductile iron must be used since the slope exceeds 30%. Please showthe appropriate material as stated by the King County Manual if you are to use the anchor detail they provide. (Table 4.2.1.A). b.Please note your engineer could potentially recommend another anchoring system that will allow for use of HDPE. c.Please note that the King County Manual also states above ground installation is recommended on slopes greater than 40%. The proposed storm line has a slope of 40%, please have your licensed GeotechnicalEngineer address whether the pipe should be above ground. d.Please provide approval of the pipe material, pipe anchors, and proposed installation (above ground or below) from the licensed GeotechnicalEngineer and BNSF. 4/24/13 Comment: Please note that if the storm line is 20% or greater the line will need to be anchored. Please show the locations where the storm line will be anchored. 10)OK 11)7/11/13 –Comment was addressed; however, no structures can be located within the easement or no private utility systems may run parallel within the City Sewer Easement. Please relocate the storm line and structure such thatit is located outside ofthe easement. It is permissible to have the private storm line cross through the easement. 4/24/13 Comment:Please show the limits of the City Sewer (8306230279-10’) and Access Easement (8301200190 –10’)and note the recording number on the plans (Site Plan and Civil Plans). 12)OK 13)OK 14)OK 15)OK Please resubmit 3 copies of the revised SitePlansand associated documents with a written response to each item to the Permit Coordinator. Please contact me at 425-771-0220ext 1321or bye-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED7/11/2013PAGE (1)