Loading...
bld20130219-McDonalds-E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:March 28, 2013 TO:Derek Smith dsmith@fhoarch.com FROM:Jeanie McConnell, Engineering Program Manager RE:Application#:bld20130219 Project:McDonalds Alteration/Remodel Project Address: 21420 Highway 99 During review of the abovenoted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. City of Edmonds handouts,standard detailsand development codecan be referenced on the City website. 1.Please provide a Temporary Erosion Control Plan a.Significant disruption to the drive-thru lanes is proposed and the site shall be protected with erosion control measures during this time to prevent silt laden runoff from entering the storm system, city right-of-way or neighboring property. b.Erosion control standard details can be found on the City website. 2.Please provide a utility plan a.Plans indicate the removal or addition of a catch basin in the drive-thru lanes. Please provide a plan that clearly shows where the existing storm system is and any proposed changes to that system. b.Other utilities in the vicinity of the storm revisions should also be shown on the plans so any conflicts can be identified. c.Please also provide RIM and invert elevations at catch basins to ensure the system will function properly with any proposed changes. Please contact me at 425-771-0220 or by e-mail at jeanie.mcconnell@edmondswa.govif you have specific questions regarding these plan corrections. bld20130219-McDonalds-E1.docPage 1of 1