Loading...
bld20130323 _Echelbarger-2.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20130323 May 15, 2013 th Project Name/Address: Echelbarger New Single Family Residence 18129 86 PL W Contact Person/Address/Fax: Tod todd@echelbarger.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov : Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. Site Plan: 1. 5/15/13 Not done. The plot or site plan needs to show the location of all the utilities (ie water line, sewer line, etc.) from the property line to the house and the detention system location and connection to the house but does not need to include the details (length, size, etc.). 2. Done. 3. Done. 4. Done. 5. Done. 6. Done. 7. Done. 8. 5/15/13 New Comment: The lot coverage and the impervious surface for the residence are both shown as 2825 sf. These numbers can not be the same since the impervious surface for the residence should include the roofline. Please revise. Storm/Utility 1. Done. 2. Done. 3. 5/15/13 Footing drains can not daylight on property. Some options are to tie them into the storm line after the detention system or direct to a drywell. Are footing drains required for this project? If so, please show where they will discharge. Footing drains can not be connected to the detention system. 4. Done. 5. Done. DATE FAXED/E-MAILED 5/15/2013 PAGE _1__ OF _2_ 6. Done. Erosion/Grading 1. Done. 2. Done. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 5/15/2013 PAGE _2__ OF _2_