bld20130329-McDonalds-Civil Review-E2.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:July 10, 2013 TO:Janelle Taflin jtaflin@pacland.com FROM:Jeanie McConnell, Engineering Program Manager RE:Application#:bld20130329 Project:McDonalds Restaurant Project Address: 10124Edmonds Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. City of Edmonds handouts, standard details and development code can be referenced on the City website. st 1Review –May 30, 2013 nd 2Review –July 10, 2013 GENERAL July 10, 2013 –response comments state this was submitted, but I was not able to find a 1. copy in the submittal package. Can you please email this to me? May 30, 2013 -Please provide an itemized engineers cost estimate, including units and unit prices, for both on-site and off-site (right-of-way) improvements, including traffic control.The City recommends use of the King County Site Improvement Bond Quantity Worksheet. A bond is required to be placed for all right-of-way improvements. The amount of the bond o will be based on 120% of the City approved estimate for all right-of-way improvements. The City will inform you of the appropriate bond amount after review of the cost estimate. Bond forms can be obtained from Linda Thornquist, Permit Coordinator –425-771-0220 or linda.thornquist@edmondswa.gov Inspection fees for this project will be calculated at 2.2% of the 120% City approved o estimate for all improvements. ok 2. ok 3. ok 4. July 10, 2013 –Response comment states “Additional information provided to WSDOT 5. for their review and approval. bld20130329-McDonalds-Civil Review-E2.docx Page 1of 5 5/30/2013 comment -As noted in my email yesterday, WSDOT has recently weighed in on the Walgreens project just east of this project on Edmonds Way and has required separate permit approval for the pavement restoration in Edmonds Way. Please contact Steve Benenati at 206- 440-4915 or benenas@wsdot.wa.gov to confirm whether they will require a permit for the subject project. July 10, 2013 –Response comment states “Revised plans to show connections to OVWSD 6. systems and submitted to OVWSD for review and approval”. 5/30/2013 comment -The email sent yesterday also discussed the possibility of OVWSD requiring connection to their sanitary sewer system as the existing property is served by their district. Please confirm that OVWSD is acceptant of the proposal to connect the new sanitary sewer line to the Edmonds main line that runs along the SE property line. I’d be happy to participate in any conversations or meetings that may be needed to sort through this. STORMWATER REPORT The following comments are provided from Jerry Shuster, Stormwater Engineer. Please contact Jerry directly at 425-771-0220 or by email at jerry.shuster@edmondswa.govwith any specific questions you may have regarding these comments. Consistent with email communications between Jenelle Taflin and Jerry Shuster, the stormwater modeling has been revised and found to be acceptable. Please resubmit a revised drainage report and stormwater plans consistent with the approved design revisions. SHEET CVR-1–COVER SHEET ok 1. July 10, 2013 –Only the electrical service is provided by PUD. PSE (actually InfraSource) 2. is the gas utility provider. 5/30/2013 comment -Electrical service is provided by PUDat this location. SHEET CVR-2–CITY STANDARD NOTES ok 1. ok 2. SHEET D-1.0–DEMOLITION PLAN 1.Revise Key notes to include the following underlined verbiage: ok #1. #8.Note added, but needs to be revised to state “ … and nearest downstream …” “… and cap as necessary at on-site structure if not removed and nearest downstream structure in City ROWper local code” ok #9. ok 2. ok 3. SHEET D2.0 –TESC PLAN ok 1. July 10, 2013 –note added, but silt fence still shown in same location. Silt fence or other 2. barrier protection will need to be placed at the drip line of the tree to protect the root zone. Page 2of 5 5/30/2013 comment -Revise to include tree protection measures for trees to remain along NW property line. You might consider using orange silt fence to provide both TESC and barrier protection. ok 3. ok 4. ok 5. ok 6. ok 7. SHEET D-2.1–TESC NOTES AND DETAILS ok 1. SHEET C-1.0–SITE IMPROVEMENT PLAN ok 1. July 10, 2013 –Response comment states “See the case studies included in this resubmittal 2. package, prepared by Keystone Retaining Wall Systems”. I looked through the submittal package and noted that most of the discussion revolved around earth pressures.The retaining wall detail on Sheet C-1.2 shows placement of reinforced soil and grid (with no specifications) and does not show the drive surface at the top of the wall. Based on the section view provided in detail 5 it would appear that the drive aisle above will place a surcharge on the wall and therefore engineered calcs/specs will need to be included with the design. 5/30/2013 comment-Please confirm that the drive aisle will not place a surcharge on the proposed retaining wall along the property frontage. If the retainingwall does support a surcharge it will need to be designed by a licensed engineer and structural calcs will needto be submitted to the City. ok 3. 4.Please revise the Site Key notes as follows: ok F– ok G– ok Y– July 10, 2013 response comments acknowledge comment, but note still exists on plan Z– set. 5/30/2013 comment -Note no longer needed –sidewalk through frontage will be held at same height. Sheet C1.1 –SITE AND PAVING NOTES AND DETAILS 1.ok July 10, 2013 –Note shall reference both the City and WSDOT. ROW permits are 2. required from both entities. 5/30/2013 comment -Please revise General Note #1 to also state WSDOT if in fact WSDOT requires you to obtain a permit. ok 3. ok 4. Sheet C-1.2–SITE DETAILS ok 1. Page 3of 5 Sheet C-1.3–SITE DETAILS ok 1. SHEET C-1.4–SITE DETAILS ok 1. SHEET C-1.5–DRIVE-THRU PLAN ok 1. ok 2. SHEET C-2.0–GRADING AND DRAINAGE PLAN ok 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok 7. Sheet C-2.1–GRADING &DRAINGE NOTES AND DETAILS ok 1. ok 2. ok 3. Sheet C-2.3–DRAINAGE DETAILS ok 1. Sheet C-3.0–WATER PLAN ok 1. ok 2. Sheet C-3.1–WATER NOTES & DETAILS ok 1. Sheet C-3.2–WATER DETAILS ok 1. Sheet C-3.3–WATER DETAILS ok 1. Sheet C-3.4–SANITARY SEWER PLAN ok 1. ok 2. Sheet L-1.0–LANDSCAPE PLAN ok 1. ok 2. Page 4of 5 Sheet L-2.0–LANDSCAPE/IRRIGATION DETAILS ok 1. ok 2. Please contact me at 425-771-0220 or by e-mail at jeanie.mcconnell@edmondswa.govif you have specific questions regarding these plan corrections. Page 5of 5