Loading...
bld20130442_6th-DaytonLLC-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20130442 May 22, 2013 thth Project Name/Address: 6 & Dayton LLC Addition/Remodel 117 6 Ave S Contact Person/Address/Fax: Timothy Linehan timothyjlinehan@hotmail.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. 1. Please add year of construction to structure. 2. Please show the utilities (e.g. gas, water, sewer etc.) from the property line to the building. 3. Please add impervious surface calculations to plans. Please note that when impervious surface is removed to dirt and the area is replaced with impervious surface( e.g. a porch) that impervious surface is considered new impervious surface. 4. Please show proposed roofline. Add any additional roofline to impervious surface calculations. 5. Show on plan where construction materials will be stockpiled. 6. A yard drain is shown next to the new porch. Is this drain existing or proposed? 7. If the yard drain is proposed, please show what runoff it will be collecting and where the drain connects to the site or public storm system. 8. If the yard drain is existing, please show catch basin protection per City Standards. DATE FAXED/E-MAILED 5/22/2013 PAGE _1__ OF _2_ Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 5/22/2013 PAGE _2__ OF _2_