bld20130524_Precision-1.docx
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check : Date:
# BLD20130524 and Bld20130525 June 17, 2013
Project Name/Address:
New Single Family Residences 8721 and 8725 Main St.
Contact Person/Address/Fax:
Precision Homes builder28@comcast.net
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and
Public Works| Engineering under Departments:
Comments for Both Lots 1 and Lot 2:
General:
The combination of the roof/deck areas given for the three lots exceeds the maximum design capacity of the
short plat detention system. The stormwater report states detention system designed for 4063 Drive area, 124 Walk area
and 6513 Roof/Deck area. The total proposed roof/deck impervious for Lot 3 and the proposed Lot 1 and 2 exceeds this
amount by 328.3 sf. Please reduce the impervious surface or submit additional information from the engineer of record
showing that the system is able to handle to excess runoff.
Stormwater/Utility Plan:
1. Rim and invert elevations shall be provided for all connections of downspouts to detention system, side sewer
connection at clean outs.
2. Call out 4” sewer clean out at the house and 6” clean out at property line or at stub to property.
Lot 1:
1.
The footing drain t/l from Lot 1 is shown connecting to the roof drain t/l of the house on Lot 2 which is then
directed to the detention system. Please redirect line to connect to the bypass stormwater line east of the
detention system.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
11