Plan Review Corrections
Plan Check : Date:
# BLD20130561 June 10, 2013
Project Name/Address:
Costa Repair 7507 Braemar
Contact Person/Address/Fax:
Frank Costa frangeesk@frontier.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and
Public Works| Engineering under Departments:
It is unclear if you plan to implement the changes to the site proposed by your geotech, Jason
Engineering. If you plan to install the catch basins and retaining wall, a site plan with measurements
and elevations must be submitted. Please see the attached example site plan.
1. Show the location of the proposed retaining wall. Please note that a retaining wall must be 3’
or under in height within your property set backs.
2. Note top elevation of wall and bottom elevation of wall at each end and at any point where
there is over 1 foot of change along the wall.
3. If catch basins are to be installed , location and distance from property line should be noted.
Also the size of the catch basins should be called out.
4. All piping shall be labeled with size, length and material.
5. Invert and rim elevations are required for all connections.
6. If any work will be performed in the right of way, a right of way application (attached) should
be completed and submitted. The application must be signed by a licensed and bonded
contractor.
If you are not planning to do this work at this time, please respond in writing for the file.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.