Loading...
bld20130561_Costa-1.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20130561 June 10, 2013 Project Name/Address: Costa Repair 7507 Braemar Contact Person/Address/Fax: Frank Costa frangeesk@frontier.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: It is unclear if you plan to implement the changes to the site proposed by your geotech, Jason Engineering. If you plan to install the catch basins and retaining wall, a site plan with measurements and elevations must be submitted. Please see the attached example site plan. 1. Show the location of the proposed retaining wall. Please note that a retaining wall must be 3’ or under in height within your property set backs. 2. Note top elevation of wall and bottom elevation of wall at each end and at any point where there is over 1 foot of change along the wall. 3. If catch basins are to be installed , location and distance from property line should be noted. Also the size of the catch basins should be called out. 4. All piping shall be labeled with size, length and material. 5. Invert and rim elevations are required for all connections. 6. If any work will be performed in the right of way, a right of way application (attached) should be completed and submitted. The application must be signed by a licensed and bonded contractor. If you are not planning to do this work at this time, please respond in writing for the file. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 11