Loading...
bld20130904_Lewis-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20130904 October 1, 2013 th Project Name/Address: Lewis/Christel Addition 1126 8 Ave S Contact Person/Address/Fax: Jay Lewis jaylewis@gmail.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing Permit Assistance: 1. The Impervious Surface Calculations are not correct on the resubmitted site plan. It is confusing the two sets of calculations that area required. The comments that you had received from the planning division were about the Lot Coverage Calculations, not the Impervious Surface calculations. The previous impervious surface calculations had been approved by the Engineering Division. I had relined a couple small things before I had signed off on the plans. The following is the version that I had approved. Existing Roof 2275 Existing Driveway 787 New Roof Area – 626 (redlined from 596) Existing Shed – 97 Existing Walkway – 80 New Entry Walk – 136 (pervious pavers) New Pervious Paver Pad – 30 (redlined from 138 which is covered already by eaves) Total New Impervious – 792 of which 166 is mitigated with pervious pavement. When you resubmit, please make these changes to the Impervious Surface Calculations. Any other comments you have received have been specifically related to the Lot Coverage Calculations which do not include eves or paved areas. Eves were only addressed since they are partially in the setbacks. This is not related to impervious surface. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 10/1/2013 PAGE _1__ OF _1_