Loading...
bld20130919 & pln20140015-Meadowview-notes re final.pdf From:McConnell, Jeanie To:"sonray2@gmail.com" Cc:Rivera, Chris;Lien, Kernen Subject:Meadowview Estates - bld20130919 & pln20140015 Date:Wednesday, January 06, 2016 4:12:13 PM Hi Ray, Thanks for taking my call today. As discussed, the City will hold off on performing a final inspection until the lot lines and utilities associated with those lots are adjusted a bit. In the meantime, I wanted to provide you with a short list of things that will need to be addressed when the time comes for a final inspection. Please confirm all catch basins are clean, risers mudded and pipe connections cut back. Sewer manholes shall be channeled to City standards. The storm filter approved for the site was to be 39” in diameter with 46.7gpm rate, however, what was installed only meets a rate of 45gpm. This was noted 7/29/2014. Fire/aid address sign shall be installed at the access road entrance. Project asbuilts to be submitted showing all utilities and access road. One hard copy and one electronic version (PDF okay) to be submitted to the City. Please let me know if you have any questions. Regards, Jeanie *¤ ­¨¤ -¢#®­­¤«« - %­¦¨­¤¤±¨­¦ 0±®¦± ¬ - ­ ¦¤± jeanie.mcconnell@edmondswa.gov ΓΑΔȃΖΖΐȃΏΑΑΏǾ ¤·³ ΐΒΒΗ 7¤¡ - ¯Ȁ ¶¶¶ȁ¬ ¯²ȁ¤£¬®­£²¶ ȁ¦®µ 0¤±¬¨³ #¤­³¤± (®´±²Ȁ -Ǿ 4Ǿ 4§Ǿ & ȟ ΗȀΏΏ ¬ ȟ ΓȀΒΏ¯¬ 7¤£­¤²£ ¸² ȟCLOSED