Loading...
bld20131173-Snap_Fitness_TI-E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: January 17, 2013 TO: Steve Butterfield sbutterfield@tgarchitects.com FROM: Jennifer Lambert, Engineering Technician RE: Application #: BLD20121173 Project: Snap Fitness – Tenant Improvement th Project Address: 505 5 Ave S During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Linda Thornquist. City of Edmonds handouts, standard details and development code can be referenced on the City website. 1.Plans indicate that there is an interior demolition to occur. a.Will you require a dumpster? If so, where do you intend to locate the dumpster? If parking / sidewalk closure is necessary then a separate right-of-way construction permit with a traffic control plan for closure will be required. b.If the dumpster is proposed to be located within the right-of-way and to remain longer than a day, please show proper night barricades. 2.Please provide a plan that shows the areas of closure with dimensions and the length of time the closure will be. You may combine this plan with the Traffic Control Plan. Please note that if the parking area / sidewalk will be closed disruption fees will be required. Please contact me at 425-771-0220 or by e-mail at jennifer.lambert@edmondswa.gov if you have specific questions regarding these plan corrections. bld20131173-Snap_Fitness_TI-E1 Page 1 of 1