Loading...
bld20131223_Zagurski_ENG1.pdf City of EdmondsBLD20131223 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments PermitApplication:Date: #BLD20131223November 19, 2013 Zagurski–Foundation Repair717 Pine St. Project Name/Address: Fred Zaurski fred@advisesecurity.com Contact Person/Address, Fax or E-mail: Chris Rivera Reviewer: Division: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.usunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1)Per geotechnical report from Dennis Bruce P.E. received on Oct. 31 2013, the drainage on thesite needs to be managed such that the water is directed away from the structures. a.Please submit a site plan showing the proposedstormwater drainage plan as directed by the Geotechnical Engineer (i.e. dry well, rain garden, detention system orinfiltration system,etc.). b.Please provide aletter of approvalfor the proposed stormwater drainage planfrom the Geotechnical Engineer. c.If the intention is to direct any stormwater to the streamyou will be required to meet the city stormwater regulationsas well asall other applicablestate&federalregulations. 2) Please provide erosion control measures on the site planin preparationofstorm water mitigation. 3)Please add a note that all disturbed soils will be compost amended. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1339or by e-mail at if you have specific questions regarding these plan corrections. chris.rivera@edmondswa.gov DATE E-MAILED11/20/2013PAGE (1)