Loading...
bld20131276_Ardsley_ENG1.pdf City of EdmondsBLD20131276 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20131276 December 26, 2013 nd Project Name/Address: Ardsley –1022–2Ave S Contact Person/Address, Fax or E-mail: Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.usunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: GENERAL 1)Please label the plan sheets (i.e. Site Plan, Stormwater/UtilityPlan, TESC Plan, etc.) accordingly. a.Please have the impervious surface chart on the Stormwater/Utility Plan. b.Please note that you may combine plan sheets (i.e. Stormwater/Utility/TESC…etc.) to one sheet as long as the plan sheet remains readable. 2)Please reference the recording number for the private sewer & utility easement. SEWER 3)Per the approved civils and topography it appears that the sewer will need to be pumped to the manhole as shown on the civils. a.Please show the pumpon the plansand refer to City Standard E6.9. b.Please refer to the handout #E62 for engineering requirementsfor sewer pumps. Please note that the City does allow E-One pumps. If the E-One pump is used a pre-design report is not required. STORM DATE E-MAILED12/26/2013PAGE (1) City of EdmondsBLD20131276 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 1)Please boldthe stubs to the infiltrationsystem, since they will be installed during the construction of the single family. 2)Please bold the driveway, directional flow arrows, and the CB to be installed in thedriveway since they will be installed during the construction of the single family. 3)Please note that theinfiltration system is designed to allow for thecollection of the flows from the footing drains. You may show either a separate drywell or show the footing drains connected to the infiltration system. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. DATE E-MAILED12/26/2013PAGE (2)