Loading...
bld20131276_Ardsley_ENG2.pdf City of EdmondsBLD20131276 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20131276 February 25, 2014 nd Project Name/Address: Ardsley –1022–2Ave S Contact Person/Address, Fax or E-mail: Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.usunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: st 1Review –12/26/13 nd 2Review –2/25/14 GENERAL OK 1) OK 2) SEWER 2/25/14 –Comment ‘b’was not addressed. Please provide designed calculcations as stated in #2 of 3) Handout #E62. 12/26/13 Comment: Per the approved civils and topography it appears that the sewer will need to be pumped to the manhole as shown on the civils. a.Please show the pumpon the plans and refer to City Standard E6.9. b.Please refer to the handout #E62 for engineeringrequirementsfor sewer pumps. Please note that the City does allow E-One pumps. If the E-One pump is used a pre-design report is not required. DATE E-MAILED2/25/2014PAGE (1) City of EdmondsBLD20131276 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments STORM 1)OK 2)2/25/14 –Comment was partially addressed.Per the directional flow arrowson theplans provided, it appears that a portion of the drivewaywillrunoffinto the landscape area. The entire surface water runoff from the drivewaymust be collected and discharged to the onsite stormwater management system(i.e. sloping the driveway, installing curb, etc.). Please revise the plans accordingly. ---Please note you can redline this change to the plans. 12/26/13 Comment: Please bold the driveway, directional flow arrows, and the CB to be installed in the driveway since they will be installed during the construction of the single family. 3)OK Please resubmit 3 copies of the revised plansand associated documents with a writtenresponse to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. DATE E-MAILED2/25/2014PAGE (2)