bld20131278_Ardsley_ENG1.pdf City of EdmondsBLD20131278 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20131278 December 26, 2013 nd Project Name/Address: Ardsley –1026–2Ave S Contact Person/Address, Fax or E-mail: Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.usunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: GENERAL 1)Please label the plan sheets (i.e. Site Plan, Stormwater/UtilityPlan, TESC Plan, etc.) accordingly. a.Please have the impervious surfacechart on the Stormwater/Utility Plan. b.Please note that you may combine plan sheets (i.e. Stormwater/Utility/TESC…etc.) to one sheet as long as the plan sheet remains readable. 2)Please reference the recording number for theretaining wall &private drainageeasements. SEWER 3)Per the approved civils and topography it appears that the sewer will need to be pumped to the manhole as shown on the civils. a.Please show the pumpon the plans and refer to City Standard E6.9. b.Please refer to the handout #E62 for engineering requirementsfor sewer pumps. Please note that the City does allow E-One pumps. If the E-One pump is used a pre-design report is not required. DATE E-MAILED12/27/2013PAGE (1) City of EdmondsBLD20131278 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments STORM 1)Please bold the stubs to theinfiltration system, since the connections will be madeduring the construction of the single family. 2)Please bold and callout the permeable driveway since the driveway will be installed during the construction of the single family. 3)Please show the permeable pavement detail and associated notes that was approved with the short plat civils on the plans. 4)Please remove the driveway swale and CB. Since the driveway will be permeable this is not needed. 5)Please add a note that if the driveway subgrade slope exceeds 2%, check dams will be required. 6)Please note that the infiltration system is designed to allow for the collection of the flows from the footing drains. You may show either a separate drywell or show the footing drains connected to the infiltration system. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. DATE E-MAILED12/27/2013PAGE (2)