Loading...
BLD20131421 Plan Review Comments.pdf CE ITY OF DMONDS th •1215AN•E,WA98020 VENUE ORTH DMONDS P: 425.771.0220 • F: 425.771.0221 • W:www.edmondswa.gov HONEAXEB DSD:P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING February 25, 2014 Mr. Bernand Hou Architectural Werks Email: Bernand@awerks.com RE: PLAN REVIEW COMMENTSFOR PLANCHECK #BLD20131421 THTH 5AVENUE ANIMAL HOSPITALLOCATED AT 310 5AVE. S. Dear Mr. Hou: Ihave reviewed the above building permit applicationfor the Planning Division,and it was found that the following information, corrections, or clarifications will need to be addressedbefore review can continue: SitePlan: 1.Please make the following revisions to your site plan (Sheet A1.1): a.Refer tothe sample plot plan and plot plan checklist (Handout #B57, enclosed) for guidance on all minimum items to be indicated on the site plan. b.Label the lengths of each property line. c.Provide the lot area. d.Indicate the location of the “living wall” on the western side of the building. ADB Review: 2.As you are aware, the Architectural Design Board (ADB) approved the design review application (File No. PLN20130027) for the subject proposal on August 7, 2013 with conditions. Please respond to the following commentsrelated to the ADB’s conditions of approval: a.One of the ADB’s conditions stated the following: “All mechanical equipment and other utility hardware on the roof, grounds, or buildings shall be screened to mitigate view impacts from street level. Screeningcould include the use of architectural elements, landscaping and/or fencing.”It is understood that you are proposing a mechanical screen on the roof of the first floor. Please provide the height of this screen and the heights of the future HVAC equipment in order to ensure that the screen will be tall enough to provide sufficient screening.Additionally, it is unclearif the transformer located on the western side of the site will be sufficiently screened. Please provide the height of the transformer as well as documentation showing that the proposed landscapingwill sufficiently screen the transformer and/or add additional screening to mask the transformer (i.e. taller shrubs, fence, etc.). b.One of the ADB’s conditions stated the following:“The metal cornice shall be carried around the eastern side of the second floor instead of metal coping.”Please revise the plans to comply with this condition. Materials/Colors: 3.Please respond to the following comments regarding the design of the exterior of the building, including the proposed materials and colors: a.Indicate all building materials and colors on eachof the building elevation views so that staff can confirm that the design of the building exterior is consistent with that which was approved by the Architectural Design Board (ADB). b.The building plans indicate ground face CMU on the center band of the northern building elevation; however, the plans reviewed by the ADB indicated that this band would be smooth face CMU. As indicated on the plans reviewed by the ADB, this façade would have bands of painted concrete, smooth face CMU, and ground face CMU. This change in materials, together with the use of different colors, providessome visual relief to this façade. Please provide the reasoning for Page 1of 2 changing the smooth face CMU band to ground face CMU, and make any needed corrections in order to achieve the same effect that was originally indicated on the plans reviewed by the ADB. c.It was noted that the rain screen panels indicated on the plans reviewed by the ADB were changed to high-pressure laminate wall panels. Please provide documentation of any differences in appearance (i.e. colors,material, etc.)between the previously proposed rain screen panels and currently proposed high-pressure laminate wall panels. Height Calculations: 4.Please respond to the following comments regarding the height calculations: a.The maximum allowed height within the Downtown Business, BD2,zone is 30 feet above average original grade. In order to confirm compliance with height requirements, please provide height calculations on the site plan, including indication of the datum point utilized for the height calculations. Refer to Handout#B41 (enclosed) for guidance. b.It was noted that you included average grade calculations on your site plan, but these were not full height calculations. Additionally, your average grade calculations were based on existing grades, but the height calculations must be based on average originalgrade. c.In addition to providing full height calculations on the site plan, please also indicate the elevations of the average original grade, maximum allowed height, and proposed height on the building elevationviews.Although your elevation views indicate an average level and maximum building height, these elevations will need to be consistent with those ofthe height calculations. Landscape Plan: 5.Please address the following comments regarding the landscape plan: a.ECDC 20.13.015 establishes the minimum sizes at installation for shrubs and groundcover as well as the maximum allowed spacing. Please review the minimum size and maximum spacing requirements of ECDC 20.13.015 and revise the landscape plan as necessary in order to comply with these requirements(i.e. it is unclear if the proposed shrubs meet the minimum size requirement). b.Once the requested changes have been made to the landscape plan, please provide a cost estimate for all labor and materials for installation of the landscaping. This estimate will be utilized for calculation of the required landscape maintenance bond. The maintenance bond itself, however, does not need to be submitted until the landscaping has been installed. The maintenance bond will be requested at the time of the Planning Division’s inspection of the project. Signage: 6.Your elevation views indicate future signage. Please note that signage will be reviewed for code compliance at the time of submittal of a sign permit application. Please submit three copies of your revised site plan (including one reduced copy) and two copies of any revised building plan sheets to a Development Services Permit Coordinator. Our office hours are Mondays, Tuesdays, Thursdays, and Fridays between 8:00 am and 4:30 pm, and Wednesdays between 8:00 am and noon. or (425) 771-0220. If you have any questions, feel freeto contact me at Jen.Machuga@edmondswa.gov Sincerely, Development Services Department -Planning Division JenMachuga Associate Planner Page 2of 2