bld20140008_Campbell-1.docx
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check : Date:
# BLD20140008 February 14, 2014
th
Project Name/Address:
Campbell Nelson Commercial Car Sales Lot 24015 240 St SW
Contact Person/Address/Fax:
ADAIR Enterprises, LLC winlessley@frontier.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and
Public Works| Engineering under Departments:
General:
1. Please add address to plans and reports: 20415 240th St SW.
2. Add lot square footage on plans
3. Add impervious surface calculations box on plans as shown on the Classification
Worksheet found in Stormwater Handout E# 72.
Utilities:
Water:
4. Call out location and size of water meter
5. Call out size, material and length of water service line.
6. Will hose bibs be installed? Show location and water lines with the information requested
in #2 for all lines.
Sewer:
1. Show 4” or 6” side sewer clean out at office connection and 6” clean out at property line.
Clean out at property line is required to have a 12” locking cast iron lamphole cover.
Please note on plans.
2. Add invert elevations at both clean outs and call out length of pipe to verify minimum slope
of 2% is achieved.
3. Provide invert elevation for proposed connection to sewer main. A 2% minimum slope shall
be attained.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
13
4. Call out length and material of 6” pipe in right of way (lateral).
5. Call out length, material and pipe size of side sewer on private property.
6. Will there be washing of cars on the lot? It is considered an illegal discharge to allow
anything other than clear runoff into the storm system. Please provide appropriate
measures to assure this water is handled per DOE standards.
Stormwater: The following comments were provided by Jerry Shuster, City Stormwater
Engineer.
The submittal is incomplete.
The Drainage Report does not describe how the design complies with the Category 2 Small Site Project
minimum requirements.
The modeling is not done in accordance with the Edmonds Stormwater Code Supplement requirements (Section
5.7.3.1).
An example drainage report containing a detention system designed for a Category 2 Small Site project is
enclosed. Please use this as a template for the next submittal and note the additional comment embedded in the example
report under Minimum requirement #7, Flow Control.
Sincerely,
Jerry Shuster, P.E.
Stormwater Engineering Program Manager
City of Edmonds
121 5th Ave N.
Edmonds, WA 98020
Desk Phone: 425-771-0220 x1323
Fax: 425-672-5750
Jerry.Shuster@edmondswa.gov
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
23
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
33