Loading...
bld20140008_Campbell-1.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20140008 February 14, 2014 th Project Name/Address: Campbell Nelson Commercial Car Sales Lot 24015 240 St SW Contact Person/Address/Fax: ADAIR Enterprises, LLC winlessley@frontier.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: General: 1. Please add address to plans and reports: 20415 240th St SW. 2. Add lot square footage on plans 3. Add impervious surface calculations box on plans as shown on the Classification Worksheet found in Stormwater Handout E# 72. Utilities: Water: 4. Call out location and size of water meter 5. Call out size, material and length of water service line. 6. Will hose bibs be installed? Show location and water lines with the information requested in #2 for all lines. Sewer: 1. Show 4” or 6” side sewer clean out at office connection and 6” clean out at property line. Clean out at property line is required to have a 12” locking cast iron lamphole cover. Please note on plans. 2. Add invert elevations at both clean outs and call out length of pipe to verify minimum slope of 2% is achieved. 3. Provide invert elevation for proposed connection to sewer main. A 2% minimum slope shall be attained. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 13 4. Call out length and material of 6” pipe in right of way (lateral). 5. Call out length, material and pipe size of side sewer on private property. 6. Will there be washing of cars on the lot? It is considered an illegal discharge to allow anything other than clear runoff into the storm system. Please provide appropriate measures to assure this water is handled per DOE standards. Stormwater: The following comments were provided by Jerry Shuster, City Stormwater Engineer. The submittal is incomplete.  The Drainage Report does not describe how the design complies with the Category 2 Small Site Project minimum requirements.  The modeling is not done in accordance with the Edmonds Stormwater Code Supplement requirements (Section 5.7.3.1). An example drainage report containing a detention system designed for a Category 2 Small Site project is enclosed. Please use this as a template for the next submittal and note the additional comment embedded in the example report under Minimum requirement #7, Flow Control. Sincerely, Jerry Shuster, P.E. Stormwater Engineering Program Manager City of Edmonds 121 5th Ave N. Edmonds, WA 98020 Desk Phone: 425-771-0220 x1323 Fax: 425-672-5750 Jerry.Shuster@edmondswa.gov DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 23 Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 33