Loading...
bld20140023-Steves-E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:February 7, 2014-revised TO:Howard Chermak Chermak Construction howard@chermak.com FROM:Jeanie McConnell Engineering Program Manager RE:Plan Check #:BLD20140023 Project& Address :Steves-746 Edmonds Street During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a Permit Coordinator. City of Edmonds handouts and standard details can be referenced on the City website under Permit Assistance. 1)Please provide the impervious surface calculations as shown on the plans in the table format provided below. Pleasenote,it does not look as though the concrete slab (patio) was part of the original approved plans for the single family residence and if the surface water runoff was not collected from this areaand discharged to the detention system then a credit would not be given for this area. IMPERVIOUS SURFACE CHART LineTypeArea (square feet) 1.Non-Regulated ExemptRegulated 2.Replaced 3.New (Post 1977)+ Total Regulated Impervious Area 4.= Mitigation required if in excess of 2000sf 5.Total Area Mitigated by Existing Stormwater Management System(s)- = 6.Regulated Area Not Yet Mitigated 7.Area Proposed to be Mitigated by Low Impact Development Techniques= 8.Area Proposed to be Mitigated through Conventional SWM Techniques= 2)Show location of existing utilities on the site, including water, sewer and storm. I have included with these plan comments a sewer asbuilt as well as information on the stormwatermanagement system. 3)Please show a point in the sanitary sewer system that would allow for draining the hot tub. The connection cannot be direct, but needs to be close enoughto pump water from the hot tub to the sewer system. 4)Please indicate whether the hot tub will have an autofill system or it the tub will be filled from a nearby spigot. If filling from a spigot, please call out the need for an AVB on the spigot. 5)Please call out temporary and permanent erosion control measures on the plans. Page 2of 5 Page 3of 5 Page 4of 5 Please contact me at 425-771-0220 or by e-mail atJeanie.mcconnell@edmondswa.govif you have specific questions regarding these plan corrections. Page 5of 5