bld20140060_Burke_ENG1.pdf City of EdmondsBLD20140060 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering EngineeringPlan Review Comments PermitApplication:Date: #BLD20140060 March 14, 2014 Project Name/Address: Burke –17903Vista Del Mar Contact Person/Address, Fax or E-mail: Wayne Nelson –wayne@lqu-inc.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: GENERAL 1)Please remove the crossed out notes from the Sheet C1. 2)Please clearlyshow the easements and reference the easement number or plat number on the plans (maybe extend the easement lines beyond the property lines). 3)Please add a note that all disturbedsoils will be compost amended. 4)Please revise the impervious surface calculations to state how much is discharging to the existing stormwater system installed with the plat and how much is discharging to the onsite stormwater management system. 5)All surfacewater runoff from the drivewaymust be collected and discharged to the onsite stormwater managementsystem. Please remove or explain the purpose of the curb break. DRY UTILITIES 1)A minimum of 3’ separation is required between the dry utilitiesand sewer, water, and storm. Please note as such on the plans. 2)Please add a note on the plans that all utilities must go underground. DATE E-MAILED3/14/2014PAGE (1) City of EdmondsBLD20140060 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering EngineeringPlan Review Comments WATER 1)Please show the water meter located within the easementwhere the back of the water meter is located on theedge of easement. SEWER 2)Please note if any portions of the side sewer is existing; otherwise, please note it as proposed. Typically sewer laterals are stubbed to each property line, but I don’t believe this was the case for thisproperty since the lot line adjustment changed the original connection point to the manhole. 3)Please show a 6” cleanout at the edge of thestormwater easement (with the cleanout located northeast of the easementline) a.Please note that the cleanoutwillhave a12” cast iron lamphole cover and ½” hexbolts. 4)Please add a note thatthe requirement of a cleanout within 2’ of the housewill be determined by the Cityof Edmonds’sBuildingDepartment. 5)If the slope ofapipe exceeds 20%,anchors are required. Please show anchors on theside sewer line or reslope the line; such that theslope does not exceed 20%. STORM 1)If the slope ofapipe exceeds 20% anchors are required. Please show anchors on thetightlineor reslope the line; such that theslope does not exceed 20% ***The City is currently reviewing the drainage report and proposed detention system. Comments will follow, once the review is complete. *** Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to aPermit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED3/14/2014PAGE (2)