Loading...
bld20140073-Sheehan-TI.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:February 12, 2014 TO:Tom Sheehan thomassheehan@msn.com FROM:Jeanie McConnell, Engineering Program Manager RE:Application#:bld20140073 Project:Sheehan -TI th Project Address: 8304 212St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. City of Edmonds handouts,standard detailsand development codecan be referenced on the City website. 1.Please provide a traffic impact analysisworksheet.Refer to City handout E82 2.Please provide a traffic controlplan.Refer to City handout E81 3.Please revise the site plan as follows: a.Dimension the sidewalk and area between thesidewalk and property line. b.Show removal and replacement of the entire frontage –curb,gutter & sidewalk –as discussed on site. c.Reference City standard details with regards to replacementof curb, gutter and sidewalk sections. d.The existing approach will also need to be brought to standards –or as closely as possible. Please add notes to the plans accordingly andalso clearly show how the neighboring property to the east ties into this approach. Please contact me at 425-771-0220 or by e-mail at jeanie.mcconnell@edmondswa.govif you have specific questions regarding these plan corrections. bld20140073-Sheehan-TI.docx Page 1of 1