Loading...
BLD20140135 Plan Review Comments.pdf CE ITY OF DMONDS th •1215AN•E,WA98020 VENUE ORTH DMONDS P: 425.771.0220 • F: 425.771.0221 • W:www.edmondswa.gov HONEAXEB DSD:P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING March 13, 2014 Ms. Valentina Shvarova Email: valentina_ms@hotmail.com RE: PLAN REVIEW COMMENTSFOR PLANCHECK #BLD20140135 SHVAROVA DEMOLITION PERMIT APPLICATION TH ST. SW LOCATED AT 9224 240 Dear Ms. Shvarova: The Planning and Engineering Divisions have reviewed the above building permit application,and it was found that the following information, corrections, or clarifications will need to be addressedbefore review can continue: Property Ownership: 1.Since the structures proposed for removal (two sheds, deck, and deck roof) are partially located on the Firdale Village Apartments property, authorization from the adjacent property owner is required.Please submit written authorization from the adjacent property owner acknowledging the scope of work proposed under your demolition permit application (BLD20140135) and authorizing the removal of these structures from their property. Geotechnical Report: 2.The structures proposed for removal are located within and immediately adjacent to a slope that is steep enough to qualify as both an Erosion Hazard and aLandslide Hazard Areaas defined in Edmonds Community Development Code (ECDC) Section 23.80.020. Due to the proximity of these structures to the Landslide Hazard Area, a report prepared by a qualified Geotechnical Engineer is required. You submitted a report by Dennis Bruce dated March 2, 1998 with your application;however, this report was written when your property was subdivided and does not address the structures proposed for removal. Therefore, a new report is necessary. Pursuant to ECDC Section 23.80.050.A,“Acritical areas report for a geologically hazardous area shall be prepared by an engineer or geologist licensed in the state of Washington, with experience analyzing geologic, hydrologic, and ground water flow systems, and who has experience preparing reports for the relevant type of hazard.”Please submit three copies of a geotechnical report by a qualified professional addressing the followingat a minimum: a.Ensurethat the removalof the structures will comply with the specific standards contained within ECDC Sections 23.80.060 and 23.80.070.A.2. b.Address erosion control measures to be used both during and after the removal of the structures, and indicate what actions will need to be taken in order to permanently stabilize the slope. c.Address the acceptable method(s)for removal of the structures. Please submit three copies of the above requested documentsto a Development Services Permit Coordinator no later than Monday, March 31, 2014 . Our office hours are Mondays, Tuesdays, Thursdays, and Fridays between 8:00 am and 4:30 pm, and Wednesdays between 8:00 am and noon.If you have any questions, feel freeto contact usat (425) 771-0220. Sincerely, Development Services Dept.-Planning DivisionPublic Works Dept.-EngineeringDivision Jen Machuga Jennifer Lambert Associate PlannerEngineering Technician