bld20140189_Coleman_ENG2.pdf City of EdmondsBLD20140189 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20140189September 24, 2014 th Project Name/Address: Coleman -902–9Ave S Contact Person/Address, Fax or E-mail: RANDY.MUNSON@COMCAST.NET Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: st 4/24/14 –1Review -Incomplete submittal comments nd 8/29/14 –2Review rd 9/24/14 –3Review COVER SHEET(pg.1 of 4) GENERAL NOTES 1)OK GENERAL 1)OK 2)OK 3)OK New Comment –9/24/14 1)It appears that the plans do not scale at 1”=20’. Please check the plans and revise as needed. DATE E-MAILED9/24/2014PAGE (1) City of EdmondsBLD20140189 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments SWPPP & GRADING PLAN (pg.2 of 4) GENERAL NOTES 1)OK DRAINAGE AND UTILITY PLAN (pg.3 of 4) GENERAL 1)OK WATER 1)OK SEWER OK 1) STORM 1)9/24/14 –Comment was partially addressed. It appears that when scaling theplans the impervious surface amount is closer to 6300 not 5900. Please check the impervioussurface amounts/scalingand revise the impervious surface calculations and plans as needed. 8/29/14 Comment: If the site has more than 5000 sq ft of impervious surfaces, all stormwater management systems must be designed by a licensed engineer. The pre-sizing chart in Handout #E72A cannot be used regardless if less than 5000 is proposed to discharge to the detention system. Please see comments below by Jerry Shuster. 2)9/24/14 –Comment was not addressed. The plans do not show what areas of the shared driveway/access road will discharge to the onsite stormwater management. a.Please clearly show what areas will discharge to the onsite stormwater management system th for 902 9Ave S. b.Include the amount of impervious area from the shared driveway/access road in the stormwater calculations and revise accordingly. DATE E-MAILED9/24/2014PAGE (2) City of EdmondsBLD20140189 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments c.If no areas will discharge to the onsite system,please clearlyshow how no surface water runoff from the shared driveway/access road will discharge into the stormwater th management system for 902 –9Ave S. 8/29/14 Comment: If there are portions of surface water runoff not located on the subject site that will discharge to the onsite stormwater management system, the system will need to be sized to account for the additional surface water runoff. Please show what areas of the driveway/shared access road will discharge to the onsitestormwater management system. 3)9/24/14 –Comment was addressed; however, footing drains should not discharge to the onsite stormwater system unless approved otherwise. Please see stormwater #3 commentbelow. 8/29/14 Comment: Pleaseshow where the footing drains will discharge to. STORMWATER The following comments are provided from Jerry Shuster, Stormwater Engineer. Please contact Jerry directly at 425-771-0220 or by email at jerry.shuster@edmondswa.govwith any specific questions you may have regarding these comments. New comments are written in bold. 1.A “Level Spreader” is proposed for approximately 1,000 square feet of runoff.This is actually “Dispersal Trench with notched grade board” and should be referred to as such.The cited minimum 25 foot flow path does not apply to this site since the area downstream of the proposed dispersal trench is a steep slope (defined as 15% or greater).Steep slopes require a 50 foot flow path.There does appear to be 50 feet between the proposed spreader and the west property line,however, the flow will not be dispersed and therefore a flow credit cannot be granted.First the geotechnical report basically says that no water will infiltrate and second, there is a cutoff trench designed to intercept the flow and convey it to the yard drain thatconnects to the detention system via pump.Flow dispersion is discouraged in highly –9/24/14 Comment: Swale and yard drain that were in previous version need urban environments. to be restored. The site classifies as a Category 2 Small Site Project, therefore the detention sizing in handout E72A are not applicable.The introduction of the handout says: “If your site is a Category 2 Small Site Project or a Large Site Project that will have stormwater 9/24/14 detention system, this handout cannot be used. See the Supplement for more details.” Comment: Addressed The detention system must be designed per Section 5.7 of the Edmonds stormwater code supplement for –9/24/14 Comment: Partially addressed. Please state in the a Category 2 small site project. DATE E-MAILED9/24/2014PAGE (3) City of EdmondsBLD20140189 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments drainage report that site is required to meet the flowing peak flow control standards since it is in a creek drainage basin:2-yr =0.07 cfs/acre impervious; 10-yr =0.14 cfs/acre impervious; 100-yr =0.33cfs/acre impervious. Also,thatbased on these standards the allowable discharge rates for the site based on 0.14 acres impervious are: 2-yr =0.01cfs; 10-yr =0.02 cfs; 100-yr =0.05 cfs. A detail of the detention system control structure with the proper elevations of the riser pipe orifice(s) and all pope sizes must be included in the plans so it can be constructed properly per the modeling.See detail E5.4 (http://www.edmondswa.gov/services/permits-development/handouts- forms/services-permits-std-details-main-page-menu/services-std-details-storm-drainage-section-5- menu.html) 2.9/24/14–Comment was partially addressed.Itappears that the “Developed Flow Conditions Used for Pump Sizing” provided in the Appendix to the Drainage Plan used the entire 0.14 acres instead of what will flow to the proposed pump well.Also, drawing 3 has a note specified the maximum flow rate at a maximum dynamic head for a 2.5 in diameter discharge line with fittings. The drainage report does not show the calculations that lead to these values for the pump system or an overlay of the pump and system curve as required in item 4 of the pumping policy. Item 6 (dual pump and backup power) of the pumping policy can be waived since the amount of flow handled by the pump is small compared to the overall site.Item 7 (overflow path) however, needs to be discussed in the drainage report and shown on drawing 3. 8/29/14 Comment: Pump calculations (not just cut sheets) need to be included per pumping policy (http://www.edmondswa.gov/images/COE/Government/Departments/Public_Works/Policies/ENGR- DEVSTM-2001-02.Pumping.Private_Property.pdf).See enclosed example. 9/24/14 –Additional Comment:Footing drains should not be plumbed to the detention system. 3. Use a properly sized drywell per recommendation of a geotechnical engineer (groundwater should remain groundwater). 8/29/14 Comment: Once the comments above have been addressed there may be additional comments. SOIL MANAGEMENT PLAN (pg.4 of 4) GENERAL No comments DATE E-MAILED9/24/2014PAGE (4) City of EdmondsBLD20140189 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Please resubmit 3 copies of the revised plansand associated documents with a written response toeach item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. DATE E-MAILED9/24/2014PAGE (5)