bld20140221_Pirzadeh_Arbor_Fence.pdf
City of Edmonds
TH
121 5AVENUE NORTH •EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering
Plan Review Comments
Plan Check :Date:
#BLD20140221March31, 2014
th
Project Name/Address:
Pirzadeh Arbor/Fence–7409 228SW
Contact Person/Address/Fax:
David & Michelle Pirzadehdandmio@comcast.net
Reviewer:Chris RiveraDivision:Engineering
During review of the subject submittal,it was found that the following information, corrections, or
clarifications wouldneed to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.usunder City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
1)Please show utilities on the site plan (water service line, side sewer and stormwater).
2)When reviewing previously submitted site plans for theadditionsthat were proposed at the time,I notice
some discrepanciesin impervious surfaces. As well as with the use of satellite image I can see that there
areimpervious surfaces in the backyard not accounted for. Please label and show all impervious surfaces
on the plans for the front entry addition, front walkway, back patio, gravel areas,gravel along the street,
widenedasphalt driveway(please distinguish between concrete and asphalt for the drivewayon the
plans)as well as any otherimpervious surfacesand sqft. as well as provide the date of construction.
Impervious surfaces are any hard surface that prevents or retards the entry of water into the ground as it
would occur in natural conditions.Please revise the impervious surface calculations on the site plan
accordingly.
3)Please fill out and attach the table from the Site Classification Worksheet within handout E72,totaling
all existing impervious surfaces and proposed.
4)Please note thatall new impervious surfacesaddedsince 1977, exceeding2000sqft, will require astorm
watermanagement system.City records indicate a detention system was installed in 2001 for the
mitigation of 3062 sqft of storm water from the garage, breezeway, covered storage, driveway and mud
room. If additional mitigation is needed please show the storm water system.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator.Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED3/31/2014PAGE __1__ OF __1_