bld20140238_SwedishACC-2.docx CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: June 26, 2014 TO: Wade Watkinson, KPFF FROM: JoAnne Zulauf, Engineering Technician RE: Application #: bld20140238 Project: Swedish Medical Center th Project Address: 21601 76 Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. City of Edmonds handouts, standard details and development code can be referenced on the City website. See attached Bond Worksheet corrections. Sheet C4.05 1.Please add a detectable warning strip at the east side of the crosswalk. Sheet C4.03 2.Please add the COE standard details for crosswalk and stop lines in the right of way and reference on this sheet. Traffic Impact Assessment- Please provide information regarding how Entry/Concourse and 2nd Floor Shell were calculated in Table 7. Did not receive a response from traffic engineer. Stormwater Engineer Comments :  Sheet 5.13 – Ensure that existing CB 17A is large enough and in good enough condition to handle the proposed 18 inch diameter pipe coming from proposed CB 17.  Provide a profile or provide elevation of the following potential utility conflicts: Sheet C5.11 – The stormwater outlet pipe from CB 02 and the HTHW-R and HTHW-S lines o Sheet C5.12 - The stormwater outlet pipe from CB 15 and the sanitary sewer and o communication lines. Sheet C5.14 - The stormwater outlet pipe from CB 32 and the proposed stormwater line o terminating and CB 29. Swedish ACC Page 1 of 3 Utility Engineer Comments : Swedish Comments Water Sheet C2.00/C6.03  Existing manhole between SS MH101 & SS MH 102 will need to be rechanneled and plugged at the two pipe locations where the existing SS pipe will be removed. Please add callout. Sheet c6.02  Add thrust block to tee located at STA 10+18.64.  Move FH located at STA 12+12.40 so that FH run does not need vertical bends. Currently it would need to go under the steam lines. Moving it to the island to the south would fix this issue.  Civil Plans do not match Mechanical Plans for locations of tie ins with water, number of pipes, fire and standpipe location. Please ensure that the drawings are coordinated.  Add RSGV on tee just south of FH located at STA 12+12.40  Per Department of Health requirements, 4” water service RBPA drain line needs to discharge above ground.  Domestic Service RPBA needs to be within 10 feet of the 4” meter.  Unless the new building has secondary location to get water, recommend having a dual RPBA. Per Operations staff, the RPBA will need to be maintained at least once a year, which will result in a shutdown of service for that building for a few hours to allow for maintenance.  Install drain in water meter vault so that it goes straight to storm. (No cleanout or bends)  Orientation of water meter in relation to how water should flow through it is backwards please revise/flip.  Provide invert grades of pipe draining water meter. Provide detail of connection of drain to SD pipe.  Not all bends/fittings on plans show to restrain joints. Please make sure that it is shown on all of them. Or just delete the callout and rely on what is stated in Utility notes. Sheet c6.03  Add thrust block to tee located at 13+79.29 Sheet c6.10  Add detail of connection of watermeter drain to SD pipe. Sheet c6.20  Lower electrical conduit so that watermain can go over it and bury depth can be minimized. Swedish Comments Sewer Sheet C6.02  SS MH101 Invert East is higher than Invert West. Sewer flows are actually West to east, which means that the grade in that manhole is incorrect. Looks like E & W numbers need to be flipped. Please revise. Page 2 of 3  Slope, length, material and size of SS pipe coming out of building missing.  Detail reference for saddle manhole missing. Sheet c6.03  Detail reference for saddle manhole missing.  Detail reference Regular SS manhole missing. Sheet c6.04  Manhole will likely need to be rechanneled. Add note. Sheet c6.05  For SSMH 104 detail 3/C6.10 for saddle manhole is missing on sheet C6.10. Please add.  SSMH detail callout for regular MH missing. Sheet c6.10  Detail 3 for saddle manhole missing  Detail for Regular SS manhole missing Sheet C6.21  SS MH102 Invert East is higher than Invert West. Sewer flows are actually West to east, which means that the grade in that manhole is incorrect. Looks like E & W numbers need to be flipped. Please revise. Page 3 of 3