bld20140240_Kautz-1.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20140299 April 22, 2014 Project Name/Address: Kautz Route LLC Multi Family 23220 Edmonds Way Contact Person/Address/Fax: Steve Price SPRICE@RERESOURCES.COM Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing Permit Assistance: General Comments - This review is of the proposed civil improvements to the property. 1. Please make corrections on all page notes that refer to “Snohomish County” to “Edmonds” and where “county” to “city”. All standard details shall be City of Edmonds details. Please revise all sheets as necessary. 2. Notes and standard details are included in these sheets that are not referencing the construction of this project. Please revise and remove all that are not applicable. 3. Please provide a Traffic Control plan. Plan should be approved and signed by WSDOT. 4. Please provide a Striping/Signage Plan including Fire Department requirements. Include City of Edmonds Standard Details. 5. Please provide sheets C-8 and C-12 with Olympic View Water and Sewer District approval and signature. Sheet C-3 Horizontal Control 6. Please provide top and toe elevations for the landscape wall on this sheet. 7. Sidewalk shall extend to property line. Please show sidewalks to property line and add note “Transition to existing conditions shall be made at point where slopes and adjoining conditions allow.” 8. “Proposed Access and Utility Easement” along frontage of property is intended for Olympic View Water Sewer District? Please clarify. 9. Easements to the City need to go through Council for approval. Please submit as soon as possible to ensure this process can be completed as soon as possible. 10. As easement is also required for City operations crews to access the stormwater system for compliance inspections. Please provide document and show location of easement on plans. Sheet C-4 Grading and TESC DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 13 11. Revise all notes as requested in comment #1. 12. Revise note #16 to reference DOE BMP T5.13 13. Note #2 in lower right corner of sheet should read sheet C-1, not C-9 for the locations of General Notes. Sheet C-5 Road and Drainage 14. Replace Flow Control detail and Pavement section detail with City of Edmonds details. Sheet C-9 Standard Notes and Details 15. Replace City of Bellingham standard details with City of Edmonds details. 16. Road Notes and Storm Drainage Notes are largely not consistent with City of Edmonds Standard Details and Material Mods. Please remove these sections or revise to reference COE requirements. Sheet C-10 Standard Details 17. Remove WSDOT standard detail for Type 2 manhole. Replace with COE detail. Sheet C-11 Standard Notes and Details 18. This sheet includes details not consistent with COE details, details that are not used in the plans or details that are already located on other sheets. Please remove to reduce confusion. If there is one here that applies to something, please reference where it applies. Traffic Impact Analysis Worksheet 19. The prior use (210) Single Family rate was taken from the 2009 rate table instead of the 2004 rate table provided. Please revise the per unit rate for the prior use to $840.72. See handout E82 for more information. Stormwater Report and Plan Review For this application I reviewed the following:  Stormwater Site Plan Report, Edmonds Way Multifamily Development, 23220 Edmonds Way, Edmonds Washington. Prepared by Web Engineering, Revision 2, February 14, 2014.  Drawings C-5, C-6, & C-7. 1. Stormwater Site Plan Report –  Section 2.3 - The report correctly classifies the site as a Category 2 Small Site Project. The report does not, however, list all the Small Site Minimum Requirements that apply to the project and how the design meets these minimum requirements. See Edmonds Community Development Code (ECDC) Chapter 18.30.060.D.2.b and Section 5 of the Edmonds Stormwater Code Supplement (http://www.edmondswa.gov/images/COE/Government/Departments/Public_Works/Stormwater_Utility/pdf/EdmondsStorm waterSupplementFinal20100428.pdf). The document should be organized to speak to all the applicable Small Site Minimum Requirements.  Section 4.3.1 and Appendix 3 – The project uses ChamberMaxx detention chambers for storage. The “Storm Detention Chamber Volume Summary (Cross-section Calc)” in Appendix 3 uses an chamber volume of 7.94 cubic feet per lineal foot DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 23 of chamber (cf/lf) in the calculation. Information obtained by the reviewer form the manufacturer’s website (http://www.conteches.com/DesktopModules/Bring2mind/DMX/Download.aspx?Command=Core_Download&EntryId=275 7&PortalId=0&TabId=144) indicated the chambers range from 6.5 to 6.9 cf/lf (see enclosed). If the designer is using a different chamber that has 7.94 cf/lf please provide the cut sheet. If the designer is using the Chambermaxx model in the enclosed cut sheet, modify the modeling and the design accordingly. a. Appendix 3 – The “Effective Depth” parameter in WWHM3 for detention systems should be the live storage plus 1 foot of freeboard above the top of the riser. In this configuration, the value should be 3.5 feet instead of 3 feet. b. Appendix 3 –The modeling uses a 10 inch diameter riser pipe in the detention outlet structure. The “Flow Control Manhole Detail” on Drawing C-5 shows a 12 inch diameter riser pipe. Also, the modeling shows that the outlet structure for the detention system has notch height of 1 foot and notch width of 0.08 feet. The “Flow Control Manhole Detail” on Drawing C-5 shows has notch height of 0.08 feet and notch width of 1 foot. Please reconcile these inconsistencies. Also, the City of Edmonds has its own standard detail for control structures that does not use a shear gate. Please include. (http://edmondswa.gov/images/COE/Services/Permits_and_Development/Standard_Details/Storm_Drainage/E5- 4_FLOW_CONTROL_STRUCTURE.pdf).  Section 4.3.3 - The design proposes linear sand filter for treating the runoff from the pollution generating impervious surfaces. Ecology’s 2005 and 2012 Stormwater Management Manual for Western Washington (SWMMWW)state for sand Do NOT place upstream of a detention facility. In order to prevent exposure of the sand filter surface filters: “ to high flow rates that could cause loss of media and previously removed pollutants,” (Section 8.6). Also, a pre-settling chamber is not included in the design (the proposed 1 foot by 1 foot catch basin is not sufficient). Section 8.2, Volume V of Ecology’s 2005 SWMMWW requires the use of a pre-setting system upstream of a sand filter . Figure 8.7 in the 2005 SWMMWW provides an example of a linear sand filter with a sediment chamber. While the 2005 SWMMWW does not provide criteria for pre-settling, the 2009 King County Surface Water Design Manual does. It states that the pre-settling goal is to remove 50 percent of the total suspended solids and suggests some options. (Section 6.5.1). Also, sand filters must be set back at least 5 feet from property lines. Other options are available for the project to meet the basic treatment requirement beside a linear sand filter. The City of Edmonds accepts the use of “General Use –approved” technologies by Ecology. Drawings 2.  C-6 – “Sand Filter and Detention Profile” – this provides an elevation for the bottom of the “base of the chambers.” Clarify whether tis elevation is actual bottom of the chamber or the bottom of 6” rock layer below the chambers. Sincerely, Jerry Shuster, P.E. Stormwater Engineering Program Manager Jerry.Shuster@edmondswa.gov 425-771-0220 x1323 Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 33